SPS J2007003 L064 - Quick Start Guide
Document 850047442 r01 2015 July
2
Distribution Shelf
Step 5 - Set Shelf ID Jumpers
L064 Shelf (ID=2)
(no controller)
L051C Shelf (ID=1)
(with controller)
Data
cable
Step 4 - Connect Shelf to Shelf Cables
1. Install Data cables between adjacent power shelves -
J3-4.
2. Install -24V Alarm Cable (provided) from 24V Alarm
Connector to J2 pin 3 (Aux Major) on the SPS shelf with
controller.
Distribution
cable
Shelf ID
A maximum of 4 Rectifier and Converter shelves can be interconnected. Each shelf must have a unique ID.
Top Shelf
set to 1
set to 2
set to 3
set to 4
2nd Shelf
3rd Shelf
4th Shelf
Step 6 - Connect Circuit Breaker Loads
1. Verify that breaker is OFF or not installed.
2. Remove detachable terminal block
3. Insert load and load return wires
Strip 0.4 in (10 mm) 8 AWG (6 mm
2
) max.
4. Torque to 6.5 in-lb (0.75 Nm).
5. Pull wires to verify.
6. Insert detachable terminal block fully.
Detachable
Terminal Block
Screw
Load Return
+24V Load
Wire Entry
V+ V-
Step 7 - Install Breakers
Install breakers into positions as specified in Site Engineering Instructions.
Use only breakers specified in the
Slimline Power System Brochure
.
1. Remove Cover (thumb screw).
2. Verify that each Breaker is OFF.
3. Insert each Breaker fully into its position — oriented with ON position at top.
4. Remove cover knockouts for installed positions.
5. Replace Cover (thumb screw).
6. Turn each Breaker ON.
24V Alarm Cable