2 Customer Responsibilities
2.1 Responsibilities of the Purchaser/Customer
To ensure that the installation of an Innova System meets the purchaser or customer
expectations, it is important to determine who will take responsibility for the various items during
the system installation process. To help you in determining these responsibilities, review the
following checklists with the customer and assign responsibilities as appropriate:
•
Tool and Test Equipment (
)
•
Pre–Installation Checklist (
)
Contract Changes:
Be sure to inform the customer that the cost of any alteration or modification not specified in the
sales contract are liable to the customer.
The following GE-supplied equipment must be installed by the Hospital's Contractors, per room
drawings:
•
PDB (Electrical Power Distribution Box or Main Disconnect Panel)
•
Gantry & Table baseplate hole drilling (Per supplied template)
•
LCD Monitor suspension stationary rails
•
Gantry baseplate grout
•
Gantry baseplate
•
Omega/Tilting table common baseplate (if applicable)
NOTE:
In case of Tilting table upgrade, it is critical to have the table baseplate flushed in the
concrete.
Innova
TM
IGS 520, Innova
TM
IGS 530, Innova
TM
IGS 540 Pre-Installation Manual
Direction 5499972-1-1EN, Revision 2
Chapter 1 General Requirements
23
Содержание Innova IGS 520
Страница 243: ......