49-6000121 Rev. 0
35
INST
ALLA
TION INSTRUCTIONS
Installation Instructions
INSTALLATION CHECKLIST
1
. Installation has sufficient load bearing capacity and in accordance with local and regional codes.
2.
Installed in accordance with these instructions, local, and regional codes.
3.
Inspected substructure for retaining screw connections used to secure installation.
4.
,QOHW2XWOHWFRQQHFWLRQVWLJKWHQHGWRIWOEV
5.
Collector loop piping is secured and allows for expansion/contraction.
6.
3LSLQJFDQZLWKVWDQG)
7.
No connections between copper and stainless steel.
8.
6XSSO\DQGUHWXUQVOLQHVLQVXODWHGDQGSURWHFWHGIURP89GHJUDGDWLRQ
9.
9DOYHVDUH127LQVXODWHG
10.
,QVWDOOHGV\VWHPKDVDQLQFOLQDWLRQEHWZHHQWR
11.
Combined non-return/safety valve is working and drain line completed per local code.
12.
No leaks after filling the tank with water, either when water is flowing or not.
13.
:DWHUTXDOLW\PHHWVVSHFLILFDWLRQVRQSDJH
14.
South facing installation with minimized shading.
Содержание GeoSpring GT25C10BAM
Страница 39: ...49 6000121 Rev 0 CERTIFICATION THIS PAGE INTENTIONALLY LEFT BLANK SRCC OG 300 Certification ...
Страница 41: ...49 6000121 Rev 0 CERTIFICATION THIS PAGE INTENTIONALLY LEFT BLANK SRCC OG 300 Certification ...
Страница 43: ...49 6000121 Rev 0 43 CERTIFICATION THIS PAGE INTENTIONALLY LEFT BLANK SRCC OG 300 Certification ...
Страница 45: ...49 6000121 Rev 0 45 CERTIFICATION THIS PAGE INTENTIONALLY LEFT BLANK SRCC OG 300 Certification ...
Страница 47: ...49 6000121 Rev 0 NOTES Notes ...