![GE Frac-920 Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/ge/frac-920/frac-920_operating-instructions-manual_128032025.webp)
3 Installation
Fraction Collector Frac-920 and Frac-950 is delivered in protective packing material and
shall be unpacked with great care.
Any equipment connected to Fraction Collector Frac-920 and Frac-950 must fulfill appli-
cable standards and local regulations.
For detailed information on Installation, see
Fraction Collector Frac-920 and Frac-950
User Manuals
.
3.1
Site requirements
Requirement
Parameter
Indoor use
Operation site
Maximum 2000 m
Altitude
100-240 V AC ±10%, 50-60 Hz
Electrical power
Overvoltage category II
Transient overvoltages
4°C to 40°C
Ambient temperature
Stable laboratory bench
Placement
20% to 95%, non-condensing
Humidity
2
Pollution degree
3.2
Transport
The equipment can be transported on a trolley capable of supporting at least 20 kg.
NOTICE
Always lift Fraction Collector Frac-920 and Frac-950 by the base
unit, never by the delivery arm, as this may damage the arm.
Before moving the system:
• disconnect all cables and tubing connected to peripheral components and liquid
containers.
Frac-920 and Frac-950 Operating Instructions 28-9622-09 AC
25
3 Installation