GE H
EALTHCARE
D
IRECTION
FQ091013, R
EVISION
1
V
IVID
I
N
AND
V
IVID
Q
N S
ERVICE
M
ANUAL
8-46
Section 8-3 - Internal Component Replacement Procedures
8-3-5
HVPS Replacement Procedure
8-3-5-1
Tools
Use the appropriate flat and Phillips-type screw drivers, as indicated in the HVPS replacement
procedure.
8-3-5-2
Time Required
15 minutes
8-3-5-3
Preparation
Shut down the Vivid
i
n/ Vivid q N ultrasound unit, as described in
8-3-5-4
HVPS Removal Procedure
1) Make sure the Vivid
i
n/ Vivid q N LCD Display cover is securely closed and place the scanner face
down. Remove the battery as described in the
Battery Removal Procedure on page 8 - 5
2) Remove the bearing handle, as described in the
Bearing Handle Removal Procedure on page 8 - 3
.
3) Disconnect each of the two Power Supply cables from the DC Power Supply (HVPS-to-BEP and
HVPS-to-RFI), as shown below.
4) Loosen the five screws that secure the DC Power Supply to the Bottom Assembly, as shown in
.
Figure 8-55 Disconnecting the DC Power Supply Cables
Figure 8-56 Loosening the Screws on the DC Power Supply
Содержание FL000090
Страница 2: ......
Страница 30: ...GE HEALTHCARE DIRECTION FQ091013 REVISION 1 VIVID I N AND VIVID Q N SERVICE MANUAL xxviii ...
Страница 739: ......