![GE ENERGY STAR GTE16DTH Скачать руководство пользователя страница 53](http://html.mh-extra.com/html/ge/energy-star-gte16dth/energy-star-gte16dth_technical-service-manual_131383053.webp)
– 53 –
12. Cut the copper evaporator tubing as far
from the epoxy joints as possible. Do not
remove the epoxy joint. See illustration
below. Use a tubing cutter to make this cut.
DO NOT use a hacksaw.
13. Install the replacement evaporator by
hanging it on the left mounting screws.
Install the evaporator over the right
mounting screw. Tighten (2) screws to hold
the evaporator in place. Care should be
taken to prevent any foreign matter from
entering the evaporator and aluminum
tubes.
14.
Deburr the tubing ends (see previous
illustration) to remove any residue left from
the tubing cutters, using ScotchBrite or
fine emery cloth. Care should be taken to
prevent residue from entering the cut tubing
ends, which could contaminate the system.
15. Apply a few drops of LokPrep, a specially
formulated anaerobic sealant that fills in
any surface scratches. This is extremely
important to a successful, leak free joint.
16. Insert the tubing ends into the LokRing
union connector as far as they will go
(internal stop). Then rotate the connector a
full 360° to distribute the LokPrep evenly.
Содержание ENERGY STAR GTE16DTH
Страница 42: ... 42 Defrost Circuit Defrost Circuit Timer Models Defrost Circuit EDC Models ...
Страница 60: ... 60 Top Mount Electronic Defrost ...
Страница 61: ... 61 Top Mount Electronic Defrost ...
Страница 62: ... 62 Top Mount Mechanical Timer ...
Страница 63: ... 63 Top Mount Mechanical Timer ...