![GE ENERGY STAR GTE16DTH Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/ge/energy-star-gte16dth/energy-star-gte16dth_technical-service-manual_131383005.webp)
– 5 –
Safety Requirements
GE Factory Service Employees are required to use safety glasses with side shields, safety gloves and
steel toe shoes for all repairs.
Steel Toed Work Boot
Electrically Rated Glove and
Dyneema® Cut Resistant
Glove Keeper
Dyneema®Cut Resistant
Glove
Plano Type Safety Glasses
Prescription Safety Glasses
Safety Glasses must be ANSI
Z87.1-2003 compliant
Brazing Glasses
Cut Resistant Sleeve(s)
Prior to disassembly of the top freezer refrigerator to access
components, GE Factory Service technicians are REQUIRED to follow
the Lockout / Tagout (LOTO) 6 Step Process:
Step 1
Plan and Prepare
Step 4
Apply LOTO device and lock
Step 2
Shut down the appliance
Step 5
Control (discharge) stored energy
Step 3
Isolate the appliance
Step 6
“Try It” verify that the appliance is
locked out
Содержание ENERGY STAR GTE16DTH
Страница 42: ... 42 Defrost Circuit Defrost Circuit Timer Models Defrost Circuit EDC Models ...
Страница 60: ... 60 Top Mount Electronic Defrost ...
Страница 61: ... 61 Top Mount Electronic Defrost ...
Страница 62: ... 62 Top Mount Mechanical Timer ...
Страница 63: ... 63 Top Mount Mechanical Timer ...