TEST SCREENS
These screens show the test procedure, either started from the service menu (front panel keys)
or via the UPS monitoring software (ComConnect Port).
The upper line indicates the kind of test, the second line its proceeding.
Upper lines:
GENERAL SYSTEM
(Overall test of system).
QUICK BATTERY
(Quick battery test).
CALIBRATE BAT
(Deep discharge battery test).
BYPASS
(Bypass
test).
Lower lines:
TEST START
The test will start soon.
TEST ACTIVATED
The test is running.
TEST SUCCESSFUL
The test has been completed successfully.
TEST FAILED
The test has not been completed successfully.
4.4.1 Battery Test, general
Automatic test
The
LP 31
UPS conducts periodic automatic battery tests to ensure
that the batteries and the wiring are healthy and able to support power
failures.
The tests do not cause any interruption in the function of the unit and
are conducted after every 500 operating hours.
Manual test
A manual battery test can be activated:
- either through an interface kit, via the ComConnect Interface Port
(please refer to the manual of your interface package), or
- via the front panel: see below.
4.4.2 Quick Battery Test
From the standard menu first enter the service menu (press “-” and “
enter/reset
”
simultaneously during 2 seconds).
Subsequently press “-” until the following screen appears:
QUICK BATTERY
TEST PRESS ENTER
Key enter/reset confirms the selection, and the screen
shows
: