2 Installation
Installation 2
9
Valve INV-907 Instructions 56-8101-01 Edition AE
CAUTION!
Before connecting Valve INV-907 ensure the power is switched
OFF at the system pump or the complete system.
Unpacking
Unpack the valve and check the items against the packing list. Inspect the
items for obvious damage which may have occurred during transportation.
Installing the valve
1 Connect the valve with two UniNet cables as
a part of the UniNet 2 chain.
2 Set the ID-switch at the bottom to the required
valve number 0–9. The number should correspond
to that used in UNICORN.
Note:
All valves must have different numbers.
3 Mount the valve vertically, in the way it is shown in the user
documentation of your ÄKTAdesign chromatography system.
4 Apply an identification number from the labels supplied. The number
should be the same as that of the rotary switch at the bottom of the
valve. Place the number so that it is easily readable from the front.
5 Connect the tubing.
INV-907
3
Uninet 2 network
Содержание AKTA Valve INV-907
Страница 1: ...Valve INV 907 Instructions GE Healthcare ÄKTA ...
Страница 2: ......
Страница 4: ...4 Valve INV 907 Instructions 56 8101 01 Edition AE ...
Страница 6: ...6 Valve INV 907 Instructions 56 8101 01 Edition AE ...
Страница 8: ...8 Valve INV 907 Instructions 56 8101 01 Edition AE 1 Introduction ...
Страница 18: ...18 Valve INV 907 Instructions 56 8101 01 Edition AE 5 Troubleshooting ...
Страница 22: ...22 Valve INV 907 Instructions 56 8101 01 Edition AE ...
Страница 23: ...23 Valve INV 907 Instructions 56 8101 01 Edition AE ...