WINDOW REQUIREMENTS
A
1/2”
clearance below the window
stool is required.
If the storm window frame does not allow this
clearance, attach a 1
or
strip of wood
along the entire length of the window opening,
flush with the back side of the stool, or remove the
storm window for the air conditioning season.
I
*
minimum for AEM09 model.
REMOVE THE CHASSIS.
Slide chassis from cabinet by holding with left
hand while pulling on handle at bottom front of
unit. Be careful of sharp edges on the coil fins.
If your unit has corrugated packing material inside
the cabinet, it must be removed. Do not remove
the foam pads inside the cabinet.
Note: Handle is NOT intended for lifting the
unit. It is only for sliding the chassis out of the
cabinet for cleaning or maintenance.
1/2”
11~~~
20%” *
min.
L-
rei
n+>
t
stool
Storm Window Frame
or Other Obstruction
I
2.
(side retainers are already
attached on AEM09
o
1.
Attach foam gasket to top angle as shown.
2. Attach top angle with 4 Type G screws (AEM09
model only).
2a.
Install top rail and side retainers to cabinet
as shown, using 10 Type F screws
AEM
models).
(continued next page)
9