background image

Installation Preparation

7

Preparation 

WITHOUT

 an Accessory Storage Drawer

PREPARE THE OPENING 

(CONT.)

Installation over a Wall Oven and 
Warming Drawer:

NOTE:

 Additional clearances between the 

cutouts may be required. Check to be sure 
the oven supports above the Warming Drawer 
location do not obstruct the required interior 
depth and height. See Warming Drawer 
installation instructions for details.

CAUTION

 

For personal safety, the 

mounting surface must be capable of supporting 
the cabinet load, in addition to the added weight 
of the oven and drawer, plus additional oven 
loads.

PRECAUCIÓN

 Para su seguridad 

personal, la superficie de montaje deberá 
poder soportar la carga del gabinete, además 
del peso agregado al horno y al cajón, junto 
con las cargas adicionales en el horno.

Construct 
Solid Bottom 
Min. 3/8” 
Plywood 
Supported 
by  
2x4 or 2x2 
Runners all  
Four Sides

30”

23-1/2”

25-1/4”

17-1/2”

2” Min.

Per Oven 

Requirement

45-1/4” 

Min.

Per warming drawer requirement

PREPARE THE OPENING 

(CONT.)

Installation over a Wall Oven:

• If you are replacing an electric double oven 

with the combined installation of  
an Advantium 240V and a single oven, use the 
dimensions shown. The middle rail separating  
the two openings may need to be larger than  
the 2” minimum shown.

30”

23-1/2”

25-1/4”

17-1/2”

2” Min.  

(3” recommended)

45-1/4”

Min.

Construct 
Solid Bottom 
Min. 3/8” 
Plywood 
Supported by  
2x4 or 2x2 
Runners all  
Four Sides

Per Oven 
Requirement

2” Min.  

(3” recommended)

Содержание Advantium PSB9240BL

Страница 1: ...202 Espa ol For a Spanish version of this manual visit our Website at GEAppliances com Para consultar una version en espa ol de este manual de instrucciones visite nuestro sitio de internet GEApplianc...

Страница 2: ...nstructions completely and carefully IMPORTANT Save these instructions for local inspector s use IMPORTANT Observe all governing codes and ordinances Note to Installer Be sure to leave these instructi...

Страница 3: ...ci n inadecuada del producto Consulte el Manual del propietario para obtener informaci n sobre la garant a IMPORTANTE Utilice este horno s lo con el objetivo para el que fue creado Nunca use el horno...

Страница 4: ...sure to use the correct cutout when preparing the opening NOTE Model ZSC2202 CANNOT be installed with an accessory storage drawer See Installation Preparation Without an Accessory Storage Drawer for...

Страница 5: ...connected to a supply circuit of the proper voltage and frequency and protected by a time delay fuse or circuit breaker Power should be supplied from a separate dedicated 30 ampere branch circuit Wir...

Страница 6: ...abinet or cut the opening in a wall to the dimensions shown Always maintain 36 3 4 minimum height from the floor to the cutout in any single or combined installation Allow the following clearances aro...

Страница 7: ...l la superficie de montaje deber poder soportar la carga del gabinete adem s del peso agregado al horno y al caj n junto con las cargas adicionales en el horno Construct Solid Bottom Min 3 8 Plywood S...

Страница 8: ...tly wider secure a furring strip on each side of the cutout for securing the oven Always maintain 36 3 4 minimum height from the floor to the cutout in any single or combined installation Allow the fo...

Страница 9: ...and drawer plus additional oven loads PRECAUCI N Para su seguridad personal la superficie de montaje deber poder soportar la carga del gabinete adem s del peso agregado al horno y al caj n junto con...

Страница 10: ...ven 1 REMOVE THE PACKAGING AND PARTS Owner s Manual Owner s Manual Installation Instructions Glass Tray Metal Grill Tray Metal Trays 2 Turntable Ring Bottom Trim Rack 6 Brass Screws 3 required 3 extra...

Страница 11: ...IR N DA OS With oven in front of the cabinet opening Insert conduit into cabinet opening Connect oven wiring and branch circuit Lift the oven into the opening while continuing to feed the conduit in t...

Страница 12: ...tightened If installing oven with an accessory storage drawer Open the drawer Drill pilot holes through the side flanges Drive color match screws into the side flanges It is recommended that the screw...

Страница 13: ...pliance requires basic mechanical skills COMPLETION TIME One hour with the installation of an Advantium 240V oven Proper installation is the responsibility of the installer Product failure due to impr...

Страница 14: ...in Step C E The oven and storage drawer assembly is now ready to be installed Return to the Advantium 240V Built In SpeedCook Oven Installation Instructions to complete the installation 2 ASSEMBLING...

Страница 15: ...15 Notes...

Страница 16: ...Printed in China...

Страница 17: ...e cocci n r pida empotrados de 240V Advantium PSB9240DF PSB9240SF PSB9240BL PSB9240EF ZSC2200 ZSC2201 ZSC2202 49 40690 4 MFL59060926 07 20 GEA GE es una marca de la Empresa General Electric Fabricado...

Страница 18: ...iento IMPORTANTE Guarde estas instrucciones para el uso de inspectores locales IMPORTANTE Cumpla con todos los c digos y ordenanzas vigentes Nota al instalador Aseg rese de dejar estas instrucciones c...

Страница 19: ...miento para accesorios IMPORTANTE No se aprueba el uso de este horno sobre otro horno Advantium Speedcook incorporado la instalaci n de uno al lado del otro o debajo de la mesada Por razones de seguri...

Страница 20: ...rra de 120V 60Hz Consulte las instrucciones embaladas con el caj n calentador ADVERTENCIA El encendido el ctrico al circuito paralelo deber estar apagado mientras se realizan las conexiones de l nea U...

Страница 21: ...icadas Siempre deje una altura m nima de 36 3 4 desde el piso hasta el recorte en cualquier instalaci n ya sea simple o combinada Deje los siguientes espacios libres alrededor de la abertura sobre la...

Страница 22: ...gas adicionales en el horno C MO PREPARAR LA ABERTURA cont Instalaci n sobre un Horno de Pared Si reemplazar un horno el ctrico doble por la instalaci n combinada de un Advantium 120 y un horno simple...

Страница 23: ...antium 120 se podr instalar junto con otros electrodom sticos empotrables Siempre siga las Instrucciones de instalaci n de cada producto para completar la instalaci n Instalaci n de Advantium de 240V...

Страница 24: ...carga del gabinete adem s del peso agregado al horno y al caj n junto con las cargas adicionales en el horno Construya una base s lida de un m nimo de 3 8 de madera terciada sostenida por gu as de 2...

Страница 25: ...del interior del horno Owner s Manual Manual del Propietario Instrucciones de instalaci n Bandeja de vidrio Bandejas de metal 2 Anillo giratorio 6 tornillos de bronce 3 requeridos 3 extra IMPORTANTE S...

Страница 26: ...deber tomar la parte inferior sobre la parte frontal y trasera Descarte la base de gomaespuma NO USE LA MANIJA NI LOS CONDUCTOS PARA LEVANTAR EL HORNO SE PRODUCIR N DA OS Con el horno frente a la aber...

Страница 27: ...con un caj n de almacenamiento de accesorios Abra el caj n Perfore orificios piloto a trav s de las bridas laterales Introduzca los tornillos de color dentro de las bridas laterales Se recomienda aju...

Страница 28: ...ra con la instalaci n de un horno Advantium de 240V El instalador tiene la responsabilidad de efectuar una instalaci n adecuada La Garant a no cubre las fallas del producto debido a una instalaci n in...

Страница 29: ...e que la parte trasera de los costados del horno se encuentren alineados con la parte trasera y los lados del caj n NOTA La parte inferior de las bridas laterales del horno descansan directamente fren...

Страница 30: ...14 Notas...

Страница 31: ...15 Notas...

Страница 32: ...Impreso en China...

Отзывы: