Installation Preparation
7
Preparation
WITHOUT
an Accessory Storage Drawer
PREPARE THE OPENING
(CONT.)
Installation over a Wall Oven and
Warming Drawer:
NOTE:
Additional clearances between the
cutouts may be required. Check to be sure
the oven supports above the Warming Drawer
location do not obstruct the required interior
depth and height. See Warming Drawer
installation instructions for details.
CAUTION
For personal safety, the
mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of the oven and drawer, plus additional oven
loads.
PRECAUCIÓN
Para su seguridad
personal, la superficie de montaje deberá
poder soportar la carga del gabinete, además
del peso agregado al horno y al cajón, junto
con las cargas adicionales en el horno.
Construct
Solid Bottom
Min. 3/8”
Plywood
Supported
by
2x4 or 2x2
Runners all
Four Sides
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
Per Oven
Requirement
45-1/4”
Min.
Per warming drawer requirement
PREPARE THE OPENING
(CONT.)
Installation over a Wall Oven:
• If you are replacing an electric double oven
with the combined installation of
an Advantium 240V and a single oven, use the
dimensions shown. The middle rail separating
the two openings may need to be larger than
the 2” minimum shown.
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
(3” recommended)
45-1/4”
Min.
Construct
Solid Bottom
Min. 3/8”
Plywood
Supported by
2x4 or 2x2
Runners all
Four Sides
Per Oven
Requirement
2” Min.
(3” recommended)
Содержание Advantium PSB9240BL
Страница 15: ...15 Notes...
Страница 16: ...Printed in China...
Страница 30: ...14 Notas...
Страница 31: ...15 Notas...
Страница 32: ...Impreso en China...