Standard Installation Preparation
6
PREPARE THE OPENING
(CONT.)
Installation over a GE Appliances/
Monogram Oven and Warming Drawer:
NOTE:
Additional clearances between the
cutouts may be required. Check to be sure
the oven supports above the Warming Drawer
location does not obstruct the required interior
depth and height. See Warming Drawer
installation instructions for details.
For personal safety, the
mounting surface must be
capable of supporting the cabinet load, in
addition to the added weight of the oven and
drawer, plus additional oven loads.
PREPARE THE OPENING
(CONT.)
Installation over a GE Applainces/
Monogram Oven:
* If you are replacing a GE Appliances/
Monogram electric double oven with the
combined installation of an Advantium 120 and
a single oven, use the dimensions shown. The
middle rail separating the two openings may
need to be larger than the 2” minimum shown.
Construct
solid bottom -
Min. 3/8” plywood
supported
on all four sides.
Must be able to
support weight
of oven and
contents.
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
(3” Recommended)
Per Oven
Requirement
45-1/4”
2” Min.
(3” Recommended)
Per Warming
Drawer
Requirement
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
(3” Recommended)
45-1/4”
Min.
Construct
solid bottom
- Min. 3/8”
plywood
supported
on all four sides.
Must be able to
support weight
of oven and
contents.
Per Oven
Requirement
CAUTION
IMPORTANT:
Always maintain 36-3/4” minimum height from the floor to the cutout in any single or
combined installation unless plastic trim is installed.
Содержание Advantium CSB9120
Страница 15: ...15 Notes...
Страница 31: ...15 Notas...