P
OWER
-
UP
ROUTINE
[EN] English
35
K0553 Revision D
During the
Power-up
routine, the following screen is displayed showing a
Progress
bar at the
bottom of the screen:
Figure 3-1 :
ADTS power-up self test screen
The
ADTS power-up self test
screen is displayed for a short time followed by the
Dashboard
.
Wireless connection
Wireless connections can only be made on ADTS units which have the Wireless option previously
enabled. See also, section Bluetooth®. Options that are currently enable are displayed on the
Power up Self Test screen. On the screen below, both Bluetooth and EPR options are enabled.
Figure 3-2 :
ADTS power-up self test screen with Bluetooth/EPR
Содержание ADTS542F
Страница 19: ...Chapter 1 Introduction ...
Страница 30: ...DUAL HAND TERMINAL EN English 19 K0553 Revision D Figure 1 8 ADTS Touch Slave ...
Страница 31: ...Chapter 2 Installation ...
Страница 34: ...PACKING FOR STORAGE OR TRANSPORTATION EN English 24 K0553 Revision D ...
Страница 40: ...Chapter 3 Operation ...
Страница 114: ...Chapter 4 Calibration ...
Страница 123: ...Chapter 5 Maintenance ...
Страница 132: ...Chapter 6 Testing and Fault Finding ...
Страница 152: ...Chapter 7 Specification ...