GE H
EALTHCARE
D
IRECTION
5245279, R
EVISION
3
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
8 - 54
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-19
Top Bottom Cover
8-2-19-1
Tools
•
Common philips screwdrivers
•
Stubby screwdriver (Flat tip and Cross tip)
8-2-19-2
Preparations
•
Shut down the system and switch off the main breaker.
8-2-19-3
Removal procedure
1.) Remove the Dummy Cover L/R. Refer to the
8-2-23 "Dummy Cover L / R" on page 8-60
2.) Unscrew 7 screws (1-7) from the bottom of the top cover. Refer to the figure below.
3.) Remove the Top Buttom Cover.
4.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-19-4
Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-94 Top bottom cover
Table 8-20 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5245279, Rev 3+, Section 8-2-19. Equipment
passed all required tests and is ready for use. “
Содержание 5329629
Страница 2: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 2 ...
Страница 9: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SEVICE MANUAL vii JA ZH CN KO ...
Страница 22: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 10 ...
Страница 130: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL 4 50 Section 4 9 Board Function Checks ...
Страница 477: ......