The home generator control panel, located inside the
generator housing, is shown below.
Brief descriptions of the controls used during installation are:
A - Circuit Breaker — Must be
on
to supply power to the
transfer switch. Breaker enclosure includes removable
bottom panel to assist with conduit connections.
B - SET EXERCISE — Used to set exercise cycle start time.
C - MANUAL OVER-RIDE — Used to manually start and stop
the generator.
D - 15 Amp fuse — Protects DC control circuits.
E - System Switch — Switches modes to
off
or
auto
.
F - Digital Display — Displays running time in hours or
fault codes.
See
Controls
in the Operator’s Manual for more information..
system switch
This two-position switch is the most important control on the
home generator and is used as follows:
• “
auto
” position is the normal operating position. If a
utility power outage is sensed, the system will start
the generator. When utility power is restored, lets the
engine stabilize internal temperatures, shuts off the
generator, and waits for the next utility power outage.
• “
off
” position turns off running generator, prevents
unit from starting and resets any detected faults.
15 amp fuse
Protects the home generator DC control circuits. If the fuse
has ‘blown’ (melted open) or was removed, the engine cannot
crank or start. Replace the fuse using only an identical
ATO 15 Amp fuse. One spare fuse is supplied with the unit.
If fuse was blown or removed, you will need to reset the
exercise timer (see
Setting Exercise Timer)
.
C
E
D
A
B
F
Содержание 45000
Страница 1: ...GE Home Generator Systems 45000 Watt Home Generator System Installation and Start Up Manual ...
Страница 24: ...24 Schematic Diagram ...
Страница 25: ...25 Wiring Diagram ...