GE 131-10595-2 1-07 JR Скачать руководство пользователя страница 13

FINAL CHECKLIST

Check to make sure the circuit breaker is closed (Reset) or the circuit fuses are replaced.

Be sure power is in service to the building.

Check to be sure that all packing materials and tape on metal panel (if applicable) under control
knobs and drawer have been removed.

12

OPERATION CHECKLIST

Check to make sure the Clock display is energized. If a series of horizontal red lines appear in 
the display, disconnect power immediately. Recheck the range wiring connections. If change is
made to connections, retest again. If no change is required, have building wiring checked for
proper connections and voltage. It is recommended that the clock be changed if the red lines
appear.

Push down and turn any one of the four surface knobs to “MED” setting to observe that the 
element glows within 15 seconds. Turn the knob off when glow is detected. If the glow is not 
detected within the time limit, recheck the range wiring connections. If change is required, 
retest again. If no change is required, have building wiring checked for proper connections 
and voltage.

13

13

Installation Instructions

Содержание 131-10595-2 1-07 JR

Страница 1: ...appliance must be properly grounded ATTENTION INSTALLER All electric drop in ranges must be hard wired direct wired into an approved junction box A plug and receptacle is NOT permitted on these produ...

Страница 2: ...d hookup of your range connected by a qualified electrician After installation have the electrician show you where your main range disconnect is located Check with your local utilities for electrical...

Страница 3: ...he kitchen floor Flatten and place a piece of the shipping carton in front of the installation location to protect the flooring Inspect Installation Location Inspect cutout dimensions and location of...

Страница 4: ...ts for 0 spacing from vertical walls below countertops Allow 1 4 minimum clearance at the back wall above the countertop Wall coverings counters and cabinets around range must withstand heat up to 200...

Страница 5: ...nd mark with a straight edge Using a straight edge mark the back line at 23 3 16 from the front edge of the counter Be careful not to damage the adjacent cabinets while cutting the countertop Remove c...

Страница 6: ...ion box Feed wires and conduit through the open hole and snap the conduit fitting into the hole Route the conduit in a manner that will not interfere with the rear wire cover The conduit must be route...

Страница 7: ...using wire nuts Attach the appliance grounding lead green or bare copper in accordance with local codes If the residence grounding conductor is aluminum see WARNING note see page 6 Connect the oven re...

Страница 8: ...obtained NOTE TO ELECTRICIAN The 3 power leads supplied with this appliance are UL recognized for connection to larger gauge household wiring The insulation of these 3 leads is rated at temperatures...

Страница 9: ...Counter 2 For 1 18 3 cm Counter 3 For 1 5 Counter 4 For 3 5 5 Alternate shown below Anti tip bracket location rear of range Cooktop ANTI TIP INSTALLATION ALTERNATE ANTI TIP INSTALLATION Interior wall...

Страница 10: ...OPENING It is suggested that two people lift the range into place carefully setting the side metal flanges on the edges of the countertop opening Carefully slide the range toward the back of the openi...

Страница 11: ...notch on the sides of the range and not touch the top of the notch when the range is fully seated on the countertop If the screws do not meet the requirements move the screws to a position that meets...

Страница 12: ...e of slot Hinge arm Hinge notch Notch of hinge securely fitted into bottom of hinge slot Hinge in locked position REPLACING THE OVEN DOOR NOTE The oven door is heavy You may need help lifting the door...

Страница 13: ...echeck the range wiring connections If change is made to connections retest again If no change is required have building wiring checked for proper connections and voltage It is recommended that the cl...

Страница 14: ...ontrol panel ends See page 10 Step 3 A ISLAND INSTALLATION When installing in an island or other non standard location countertop cutout dimensions must be according to page 5 For the anti tip bracket...

Страница 15: ...15 Notes...

Страница 16: ...Printed in the United States 16 Notes...

Отзывы: