background image

 
 

 
 

GE 

Lighting 

LED165/M400/740 Tether Kit 

 

Installation Guide

 

 

BEFORE YOU BEGIN 

Read these instructions completely  
and carefully. Save these instructions  
for future use. 

STOP

 

WARNING

 

!

 

Risk of electrical shock

. Disconnect power before servicing  

or installing product.  Properly ground electrical enclosure. 

WARNING

 

!

 

 
 

Risk of injury or damage. 

Unit will fall if not installed properly. 

Follow installation instructions. 

CAUTION

 

!

 

CAUTION

 

!

 

Risk of injury. 

Wear safety glasses and gloves during 

installation and servicing. 

Check the ballast information. Make sure the ballast is in  
GE’s ballast compatibility list. Using with wrong ballast may 
result in overheat or lamp damage. See ballast compatibility list 
at: 

http://www.gelighting.com/led-hid-ballast-compatibility 

 

 

Tools and Components Required  

 

 

• Nut driver or small socket wrench 

Warning: 

Only use the parts provided with the kit.   

Please contact GE at 

1-800-338-4999

 for any questions/issues regarding the kit.

 

Содержание LED 165

Страница 1: ...rly Follow installation instructions CAUTION CAUTION Risk of injury Wear safety glasses and gloves during installation and servicing Check the ballast information Make sure the ballast is in GE s ballast compatibility list Using with wrong ballast may result in overheat or lamp damage See ballast compatibility list at http www gelighting com led hid ballast compatibility Tools and Components Requi...

Страница 2: ...s 3 High Temperature Lock Nuts 1 extra nut is provided for your convenience 1 Tether Kit includes 1 tether wire 2m 1 locker 1 hook Installation Guide LED165 M400 740 Tether Kit Instructions Step 1 Turn off the power Remove the LED lamp from the fixture ...

Страница 3: ...over the LED area Step 3 Holding the U shape rod in place slide the steel ring over the base of the lamp and engage the threaded portion of the steel rod Make sure the wings of the steel ring are pointing away from the base Step 4 Feed the provided nuts through the threaded rods on both side of the ring Hand tighten using a nut driver or small socket wrench For reference installation torque betwee...

Страница 4: ...g hole on the Steel ring Step6 Screw the LED lamp with the mounted kit into the fixture Step 7 Loop the wire around a load bearing building structure then insert the wire into the other end of the locker WRONG Assembly U shape rod over the LED area Wings of steel ring NOT pointing away from the base ...

Страница 5: ...perty of their respective owners Information provided is subject to change without notice All values are design or typical values when measured under laboratory conditions GE Lighting and GE Lighting Solutions LLC are businesses of the General Electric Company 2016 GE 16 0113 Rev 3 09 16 www gelighting com Only use the tether provided by GE If tether is not long enough for your installation please...

Отзывы: