Installation checkout
101
2062973-002
8
Installation checkout
The purpose of the installation checkout procedure is to ensure that the system is properly
installed and configured for use.
Service personnel shall perform the following checkout procedure for the monitoring system
after the hardware installation and platform configuration is completed:
•
•
NOTE: The manufacturer has performed the electrical safety test for the patient monitor
and acquisition modules during final inspection. You do not have to perform the electrical
safety tests during installation checkout, if there is less than 12 months since the patient
monitor was manufactured. Check the manufacturing week and year of the device from
the device label (see section
3.4.2. Equipment identification
•
NOTE: Refer to chapter
to see the recommended checkout
procedure after corrective and planned maintenance.
8.1 Visual inspection
Perform the following visual inspection to the installed monitoring system:
•
Carefully inspect the patient monitor and the connected peripheral devices for any
damage.
•
Verify that the patient monitor and the connected peripheral devices are properly
mounted with specified mounting solutions.
•
Verify that the cables between the patient monitor and the connected peripheral devices
are intact, properly connected and secured to the right connectors.
•
Verify that the modules are properly connected and locked.
•
Verify that the pivoting module frame and battery door are properly locked.
The cleaning precautions, requirements, procedures, and recommended cleaning solutions for
the patient monitor are described in the patient monitor’s user’s manual. For details about
cleaning, disinfecting and sterilizing the accessories, see the instructions for use in the
accessory package.
8.2 Electrical safety tests
Electrical safety tests provide a method of determining if potential electrical health hazards to
the patient or operator of the device exist.
8.2.1 Test setup
Test conditions
Perform electrical safety tests under normal ambient conditions of temperature, humidity and
pressure.
Test equipment
The test equipment required to perform electrical safety tests is listed below.
Содержание CARESCAPE Monitor B650
Страница 12: ...CARESCAPE Monitor B650 4 2062973 002 For your notes ...
Страница 16: ...CARESCAPE Monitor B650 8 2062973 002 For your notes ...
Страница 46: ...CARESCAPE Monitor B650 38 2062973 002 For your notes ...
Страница 58: ...CARESCAPE Monitor B650 50 2062973 002 For your notes ...
Страница 64: ...CARESCAPE Monitor B650 56 2062973 002 For your notes ...
Страница 136: ...CARESCAPE Monitor B650 128 2062973 002 For your notes ...
Страница 177: ...Troubleshooting 169 2062973 002 ...
Страница 182: ...CARESCAPE Monitor B650 174 2062973 002 For your notes ...
Страница 218: ...CARESCAPE Monitor B650 210 2062973 002 For your notes ...
Страница 224: ...CARESCAPE Monitor B650 216 2062973 002 For your notes ...
Страница 232: ...CARESCAPE Monitor B650 B 4 4 2062973 002 For your notes ...
Страница 239: ......