SEW Program with LED fault indication

The fault status right hand led segment in P 35 will move up and down so many times according to what
state each input is in.  Some earlier model operators had a red led mounted in the back plate of the operator
so the status of the operator could be seen without taking the cover off.

No of flashes

Fault description

1 flash                          Inverter fault other than fault 08

2 flashes                      Gate fully open and with open input held so gate won`t close

3 flashes

Gate fully open and with PE input fault so gate won`t close

4 flashes                      Operator manual release door open so gate won`t operate

5 flashes                      Gate at pedestrian open position and pedestrian input held so the gate will not close.

6 flashes                     Gate will do next move at slow speed because gate travel

Interrupted and previous run did not find the limit at the
Correct position

7 flashes                     Gate fully open and pedestrian input held so gate will not close.

8 flashes                     F 08 speed monitoring fault, motor can`t get to desired speed.

Check the following:

If unit is brand new, chances are the inverter has not been commissioned properly.
Check gate runs free in manual, track, wheels, guides, gate alignment.
Rack fitted correctly and meshing properly with pinion.
Clutch done up tight.
Clutch disks in good condition.
Track in good condition and no stones etc on or too close to track.
Both close and open stops in good condition.
If a brake motor, check to see if brake is releasing.
Check maximum speed and make sure opening speed
Does not exceed maximum speed.
If gate is extremely heavy, the ramp times may need to be
Increased to give the gate more time to reach its designated operating speed.
If gate is extremely heavy the low speed current setting may
To be increased. It can be adjusted from 60 percent to a Value less or equal to 80%.

Содержание 450P I

Страница 1: ...tallation and Maintenance Manual Sliding Gate Operators Inbuilt Models GDS 450P I 630P I Range Made in Australia from Australian quality imported components MOVITRAC B N14870 A B N 62 059 806 405 Oct 2017 ...

Страница 2: ...between the rack teeth and Pinion wheel Once the rack is fixed move the gate and sight the rack moving over the pinion wheel check that most of the pinion wheel meshes with the rack Make sure rack runs freely over the pinion wheel any tights spots should be corrected by adjusting the rack height Check the operator is firmly bolted down to the concrete pad Ensure stops are installed on the gate for...

Страница 3: ...tomatically fully close During this commissioning the PE beam and Door inputs are not required Once the gate is commissioned gate has fully closed the gate distance is in the memory of the inverter the Door and PE beam inputs need to be connected Give a pulse input to the open terminal and the gate will open note The gate will perform one slow speed operation to confirm the gate opening distance a...

Страница 4: ...ation Details 6 11 Electrical Cabling Mechanical Installation Plan view of installation Operator dimensions Electrical Connections Variable Speed Drive Unit Variable Speed Drive Unit Key Pad Operation Function Factory Setting Parameter Settings Gate Direction Set Up Commissioning 5 Fault Finding 12 13 6 Manual Release 15 7 Maintenance 16 8 Warranty 17 ...

Страница 5: ...y necessary signs to indicate any danger areas and automatic operation of the gate or door The operators are not designed to be used in any hazardous areas or areas subject to flooding etc All electrical connections and wiring must be performed with AS NZS 3000 2007 as the guidelines Or its counterpart for other countries outside of Australia and New Zealand WARNING ELECTRICITY CAN KILL The manufa...

Страница 6: ...ielded cable if over 8m runs 4 INSTALLATION DETAILS After reading the previous sections in this manual and having checked for suitable installation proceed as follows Electrical Cabling A suitably rated Isolator and 240v power supply should be available near to where the gate operator is to be mounted Conduits and cabling preferably to enter through baseplate knockout hole The following dimensions...

Страница 7: ...7 Plan View of Installation Operator Dimensions ...

Страница 8: ... N22 setting see notes that follow Open Initialise Input This input is used to commission the drive and also used to open and close the gate Door input The door input is a safety function due to the operator having a manual release Whenever the door is opened or the cover removed the next operation will be performed at slow speed so the inverter can reconfirm the stop positions This averts the gat...

Страница 9: ...keypad fully clockwise is maximum time 120 seconds No PE auto close meaning the gates will not close even if the PE cell beam is broken and made again No Multi user meaning the auto close time can be overridden by another input to close the gates Mode 3 Manual operation meaning input to open input to close If PE beam is broken while gate is closing the gate will reopen and wait on another input to...

Страница 10: ...tor start up function has been pre set in the factory and should not need altering Parameter Settings Par Nxx Pt 39 Input Status Pt 59 Output Status Pt 80 Fault memory records the previous faults which occurs with the inverter Pt 136 PE stop time 0 5 s N11 Opening speed 3640 rpm N13 Closing speed 3000 rpm N21 When set to formulae and powered off and on will reinitialise the gate N22 Pedestrian ope...

Страница 11: ...ully open onto the open stop The gate will then automatically start closing at slow speed do not interrupt this auto commissioning cycle as it is determining the gate opening distance CAUTION Ensure vehicles and personnel do not get in the way of the moving gate as both the photoelectric cells and door inputs are bypassed during commissioning Once the gate reaches the fully closed position the inv...

Страница 12: ...Understanding what each input does will help to clear or rectify any problem relating to the input To see the status of the inputs proceed to parameter 39 via the keypad refer to section on keypad operation for navigating your way there The various strokes relate to the inputs when the stroke is high it means the input is on and when low the input is off This screen can therefore be used to ascert...

Страница 13: ...ous run did not find the limit at the Correct position 7 flashes Gate fully open and pedestrian input held so gate will not close 8 flashes F 08 speed monitoring fault motor can t get to desired speed Check the following If unit is brand new chances are the inverter has not been commissioned properly Check gate runs free in manual track wheels guides gate alignment Rack fitted correctly and meshin...

Страница 14: ...13 13 14 6 ...

Страница 15: ... very tight If when turning the knurled knob clockwise and It just spins either try spinning it clockwise with more force to release it off of the hexagonal retaining nut or hold the nut with one hand and turn the knurled knob clockwise Once re engaged and the door is closed the inverter will need to re find its limits Give the gate a command to open it will start moving open slowly once open it w...

Страница 16: ...advertently Gate rolls freely when in manual Gate wheels and guide rollers in good condition Gate stops in good condition and not loose Gate rack is tight correct clearances between pinion wheel rack Gate track is not damaged Gate operator mounting bolts right No oil leaks from gearboxes Gearbox mounting bolts nuts tight Inside operator and control box clean Baygon Surface Spray around operator an...

Страница 17: ...stances i If no proof of date of purchase can be produced ii If the product has been used in a manner beyond its design parameters iii If the product is tampered with or repaired by personnel not authorised to do so iv In respect of loss or damage caused by rough treatment v If the product is not used and maintained in accordance with instructions or recommendations listed in this Installation and...

Отзывы: