GCL RY-12K-AUP3 Скачать руководство пользователя страница 1

07/08/2021  11:11:10     Thu

76%

2.00

KW

-1.39

KW

0.00

KW

KW

0

7

0

5

0

5

0

5

ON

Signal

   on

2.00

Hybrid Inverter

User Manual

RY-12K-AUP3

Содержание RY-12K-AUP3

Страница 1: ...07 08 2021 11 11 10 Thu 76 2 00 KW 1 39 KW 0 00 KW KW 0 7 0 5 0 5 0 5 ON Signal on 2 00 Hybrid Inverter User Manual RY 12K AUP3...

Страница 2: ...cation diagram of diesel generator 3 10 Wiring diagram 3 12 phase parallel connection diagram 6 Mode 38 39 5 6 Battery Setup Menu 5 7 System Work Mode Setup Menu 5 8 Grid Setup Menu 5 9 Generator Port...

Страница 3: ...u want to disconnect AC or DC terminals Please refer to Installa on sec on of this manual for the details Grounding instruc ons this inverter should be connected to a permanent grounded wiring system...

Страница 4: ...el port 7 Meter 485 port 8 Ba ery input connectors 9 Func on port 10 ModeBUS port 11 BMS port 12 PV input with two MPPT 13 Circuit breaker of Grid 15 Generator input 14 Load 16 WiFi Interface 17 DRM p...

Страница 5: ...03 2 2 Product Size Inverter Size Moun ng bracket...

Страница 6: ...mart Load Func on 2 4 Basic System Architecture 2 5 Maintenance of the System The following illustra on shows basic applica on of this inverter It also includes following devices to have a Complete ru...

Страница 7: ...ave received the items in the following package Wall moun ng bracket x1 Hybrid inverter x1 Parallel communica on cable x1 L type Hexagon wrench x1 Stainless steel an collision bolt M8 80 x4 User manua...

Страница 8: ...elevision Antenna or antenna cable Not higher than al tude of about 2000 meters above sea level Not in environment of precipita on or humidity 95 Considering the following points before selec ng where...

Страница 9: ...e careful when li ing out from the package Choose the recommend drill head as shown in below pic to drill 4 holes on the wall 82 90mm deep 1 Use a proper hammer to t the expansion bolt into the holes...

Страница 10: ...ed between the ba ery and the inverter In some applica ons switching devices may not be required but over current protectors are s ll required Refer to the typical amperage in the table below for the...

Страница 11: ...h a suitable cable is important for safe and e cient opera on of the system To reduce the risk of injury refer to Chart 3 2 for recommended cables All wiring must be performed by a professional person...

Страница 12: ...Temp CT 11 1 2 3 3 3 Temperature sensor connec on for lead acid ba ery Inverter...

Страница 13: ...ry contact output When the inverter is in o grid mode and the signal island mode is checked the dry contact will switch on Grid_Ry 5 6 reserved RSD 7 8 When ba ery is connected and the inverter is in...

Страница 14: ...y disconnected during maintenance and fully protected from over current The recommended of AC breaker for the load port is 32A for 12KW The recommended of AC breaker for the grid port is 63A for 12KW...

Страница 15: ...nec ng to PV modules please install a separately DC circuit breaker between inverter and PV modules It is very important for system safety and e cient opera on to use appropriate cable for PV module c...

Страница 16: ...panel is not connected to the system ground bar Safety Hint Before connec ng inverter please make sure the PV array open circuit voltage is within the 800V of the inverter Note This inverter complies...

Страница 17: ...re listed as follows a Strip o the DC wire about 7mm disassemble the connector cap nut see picture 5 3 b Crimping metal terminals with crimping pliers as shown in picture 5 4 c Insert the contact pin...

Страница 18: ...Pic 3 6 DC input connec on Warning Sunlight shines on the panel will generate voltage high voltage in series may cause danger to life Therefore before connec ng the DC input line the solar panel needs...

Страница 19: ...nec on White wire 5 4 3 6 7 8 Black wire Grid N R S T CT1 CT2 CT3 GRID N R S T PE CT Arrow pointing to inverter Note when the reading of the load power on the LCD is not correct please reverse the CT...

Страница 20: ...ter Three Phase Smart Meter SET ESC 1 7 4 10 25 24 3 9 6 10 RS 485 CHNT DTSU666 3 6 9 10 1 4 7 10 R S T Grid Inverter R R S S T T N N Parallel_A Parallel_B Meter 485 port RS485A RS485B Grid Eastron me...

Страница 21: ...be connected to ground plate on grid side this prevents electric shock if the original protec ve conductor fails Note When the inverter is in the o grid state the N line needs to be connected to the...

Страница 22: ...BAR E N Link Grid Battery BMS DC Breaker PV DC Breaker This diagram is an example for an applica on that neutral connects with the PE in a distribu on box For countries such as Australia New Zealand S...

Страница 23: ...C Breaker AC Breaker AC Breaker Battery pack Home Load R R S S T T N N PE PE R S T N PE DC Breaker for battery RY 12K AUP3 300A DC breaker AC Breaker for backup load RY 12K AUP3 32A AC breaker AC Brea...

Страница 24: ...erator 1 2 GS diesel generator startup signal relay coil open contact G S G start 1 2 dry contact signal for startup the diesel generator Remotely control signal line RY 12K AUP3 300A DC breaker DC Br...

Страница 25: ...Slave Inverter Slave Inverter EX_Meter For CT Meter Select 0 3 No Meter 01 Parallel_A Parallel_B Meter 485 Grid CT1 CT2 CT3 Backup Load Inverter No 3 slave Inverter No 2 slave Inverter No 1 master Gr...

Страница 26: ...e selec on 24 Once the unit has been properly installed and the ba eries are connected well simply press On O bu on located on the le side of the case to turn on the unit When system without ba ery co...

Страница 27: ...bu on you can enter into the system setup screen which including Basic Setup Ba ery Setup Grid Setup System Work Mode Generator port use Advanced func on and Li Ba info 4 The main screen showing the...

Страница 28: ...in Screen Solar Page Solar Graph Grid Graph BMS Page Load Graph Battery Setting System Work Mode Grid Setting Gen Port Use Basic Setting Advanced Function Device info Grid Page Inverter Page Battery P...

Страница 29: ...Battery PV1 PV2 Grid Inverter Today 0 5 KWH Total 1 60 KWH L1 220V P1 19W L2 220V P2 18W L3 220V P3 18W Load Energy This is Back up Load detail page Press the Energy bu on will enter into the power c...

Страница 30: ...ar Total System Grid Power Total CANCEL Day Month Year Total Mean Voltage 50 34V Charging Voltage 53 2V Total Current 55 00A Discharging Voltage 47 0V Mean Temp 23 5C Charging current 50A Total SOC 38...

Страница 31: ...s Factory Reset 2019 03 09 15 17 Factory Reset Reset all parameters of the inverter Lock out all changes Enable this menu for se ng parameters that require locking and cannot be set up Before performi...

Страница 32: ...es the Ba ery Grid Charge It indicates that the grid charges the ba ery This is Grid Charge you need select Batt Mode Lithium Use Batt V Battery Setting Activate Battery Max A Charge Batt Capacity Max...

Страница 33: ...is BMS protocol Please reference the document Approved Ba ery Shutdown 10 It indicates the inverter will shutdown if the SOC below this value Low Ba 20 It indicates the inverter will alarm if the SOC...

Страница 34: ...ckup load connected The hybrid inverter will neither provide power to the home load nor sell power to grid The built in CT will detect power owing back to the grid and will reduce the power of the inv...

Страница 35: ...00 05 00 08 00 10 00 15 00 18 00 5 00 8 00 10 00 15 00 18 00 01 00 Power 80 40 40 80 40 35 Work Mode2 For example Solar Sell Solar sell is for Zero export to load or Zero export to CT when this item i...

Страница 36: ...l be reset to their default values for Australia RegionA B C respec vely Grid Mode General Standard UL1741 IEEE1547 CPUC RULE21 SRD UL 1741 CEI 0 21 Australia A Australia B Australia C EN50549_CZ PPDS...

Страница 37: ...adjust inverter reac ve power FW this series inverter is able to adjust inverter output power according to grid frequency Droop F percentage of nominal power per Hz For example Start freq F 50 2Hz Sto...

Страница 38: ...s less than 5 rated power the VQ mode will not take e ect Lock out Pn 20 If the inverter ac ve power is increasing from 5 to 20 rated power the VQ mode will take e ect again For example V2 110 P2 80 W...

Страница 39: ...er will decrease linear When the ba ery SOC equals to the se ng value OFF the system frequency will become the se ng value AC couple Frz high and the Microinverter will stop working MI export to grid...

Страница 40: ...52 0 26 0Ah 0 0V 0 0A 0 0 0 50 33V 19 10A 31 0C 51 0 25 5Ah 53 2V 25 0A 0 0 0 50 30V 16 90A 30 2C 12 0 6 0Ah 53 2V 25 0A 0 0 0 4 5 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0A...

Страница 41: ...cannot and can only legally exclude all liability within a limited scope 39 The 1st priority power of the system is always the PV power then 2nd and 3rd priority power will be the ba ery bank or grid...

Страница 42: ...nute and then turn on the DC AC switch 6 Seek help from us if can not go back to normal state AC side over current fault 1 Please check whether the backup load power and common load power are within t...

Страница 43: ...re firmly and correctly connected 3 Seek help from us if can not go back to normal state F29 Parallel CAN Bus fault 1 When in parallel mode check the parallel communication cable connection and hybrid...

Страница 44: ...mmunication between hybrid inverter and battery BMS disconnected when BMS_Err Stop is active 2 if don t want to see this happen you can disable BMS_Err Stop item on the LCD 3 If the fault still exists...

Страница 45: ...e to the following reasons Damage during transporta on of equipment Damage caused by incorrect installa on or commissioning Damage caused by failure to comply with opera on instruc ons installa on ins...

Страница 46: ...RY 12K AUP3 240A 240A 15600W 39A 19 5A 26A 13A 12000 12000 Rated AC Output and UPS Power VA Max AC Current A 17 4A 17 4A Max Con nuous AC Passthrough A 97 60 E ciency Max E ciency 97 00 Euro E ciency...

Страница 47: ...ansport inverter Usually placed inverter in the packing box with tape sealing if the inverter cannot reoccupy you can choose a cheap carton for packaging Carton requirements must meet the size of the...

Страница 48: ...5 6 7 8 METER 485_B Meter 485 Pin METER 485_A COM GND COM GND METER 485_A METER 485_B 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 BMS Port Meter 485 Port 1 2 3 4 5 6 7 8 87 65 43 21 87 65 43 21 Modbus port 1 2 3...

Страница 49: ...used to connect the wi datalogger DRM port 1 2 3 4 5 6 7 8 87 65 43 21 1 No 2 3 4 5 6 7 8 DRM1 5 NetJ4_7 Modbus port DRM2 6 DRM3 7 D GND DRM4 8 REF GEN 0 NetJ4_7 De ni on of RJ45 Port Pin for DRM Port...

Страница 50: ...Ver 2 2 2023 02 16 48 1 Split Core Current Transformer CT dimension mm 2 Seconddary output cable length is 4m 12 Appendix II Lead Outside...

Страница 51: ......

Отзывы: