Operation
ORCA-I SP Operation Manual
3-28
© GBC Pro-Tech 1998 April
352&(66&21752/&+$57
Product: _____________
Process: Vinyl Transfer-Second Pass & Overlaminate Date:__________
Material Top: ________________________
Material Bottom: ______________________________
Other Material: ______________________________________________________________________
Special Instructions:___________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
CONTROL SETTINGS
Speed: 1-8 ft/min (0.3-2.5 m/min)
Reverse/Forward: Forward
Main Roll Up/Down: Down
Main Roll Pressure: 70-90 psi (481-825 kPa)
Top Heater On/Off: Off
Top Temp. Set: 32 °F (0 °C)
Bottom Heater On/Off: Off
Bottom Temp. Set: 32 °F (0 °C)
Main Roll Shim Dials: 0
Pull Roll Clutch On/Off: On
Pull Roll Clutch Pressure: 50-80 psi (344-550 kPa)
Pull Roll Up/Down: Down
Pull Roll Pressure: 50-80 psi (344-550 kPa)
Pull Roll Shim Dials: 0
Cooling: No
See Diagram 3-9A for Webbing Outline
EDNord - Istedgade 37A - 9000 Aalborg - telefon 96333500