Operation
ORCA-I SP Operation Manual
3-18
© GBC Pro-Tech 1998 April
352&(66&21752/&+$57
Two Pass Hot Laminate/Cold Mount (First Pass)
Product: _____________
Process: 2-Pass Hot Laminate/Cold Mount (1st Pass) Date:__________
Material Top:3 Mil Gloss _______________
Material Bottom:Pro-Mount______________________
Other Material: ______________________________________________________________________
Special Instructions:___________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
CONTROL SETTINGS
Speed: 4-6 ft/min (1.2-2 m/min)
Reverse/Forward: Forward
Main Roll Up/Down: Down
Main Roll Pressure: 60-80 psi (413-550 kPa)
Top Heater On/Off: On
Top Temp. Set: 220 °F (104 °C)
Bottom Heater On/Off: On
Bottom Temp. Set: 32 °F (0 °C)
Main Roll Shim Dials: 0
Pull Roll Clutch On/Off: On
Pull Roll Clutch Pressure:60-80 psi (413-550 kPa)
Pull Roll Up/Down: Down
Pull Roll Pressure: 60-80 psi (413-550 kPa)
Pull Roll Shim Dials: 0
Cooling: Optional
See Diagram 3-4A for Webbing Outline
EDNord - Istedgade 37A - 9000 Aalborg - telefon 96333500