
11
PIPE 8
Original Instructions
—
rev.2014
—
in compliance with § 1.7.4 of the Machinery Directive
2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43
–
25046 Cazzago San Martino (Bs)
–
Italia
–
Tel. + 39 030 7451154
–
Fax. + 39 030 73 56 629
MACHINE SETUP
MACHINE SETUP
MACHINE SETUP
After the machine has been removed from its packaging, position it on top of a working
bench as shown in the picture. Once found a satisfactory position fix it in place with N° 4
M16 nuts with suitable length (not included).