Monthly maintenance 

 

Air filters 

 
Filter section can be entered through bottom panel; dismounting it the filter can be extracted.

 

 
For the cleaning, utilize a vacuum cleaner or wash with normal detergent and warm water, allow to dry well. Remember 
to assemble the filter before operating the unit; replace a new filter after max 3 cleaning cycles. In case of soft bag filte r 
(option), replace it when dirty. 
 

Condensation discharge 

 
Remove side panel and clean, if necessary, the dirt and impurities that have formed in the condensation tray. Also check 
the efficiency of the trap. 
 

Water coil 

 
Check that the coil exchanger (optional) is clean and in perfect state to guarantee the normal levels of performance. 
 

Yearly maintenance 

 
Check that all the electrical equipment, in particular the fixing of the electrical connections. 
Check  the  tightness  of  all  nut,  bolts,  flanges  and  hydraulic  connections  that  the  vibrations  of  the  machine  may  have 
loosened. 
 

8

 

 

T

ROUBLESHOOTING

 

 

 

Failure searching and problem solving schedule 

 

Founded failure

 

Probable cause 

Possible solution

 

Fans are not running 

 

Power supply is switched off

 

 

Wrong 

or 

loose 

electrical 

connections 

 

Motors on thermal protection mode 

 

Switch on the power supply

 

 

Restore the right connections 

 

Check motor current 

Air performance decreasing 

 

Air filter dirty 

 

Air duct blocked 

 

Clean or replace filter

 

 

Check  air  system  (are  dampers 
open ?) 

Condensate  water  stays  inside  the 
unit 

 

Condensate drainage blocked 

 

Missing or not adequate trap 

 

Clean or free the drainage 

 

Install a right trap 

 

9

 

 

M

ATERIAL 

D

ISPOSAL

 

 

At the end of unit’s lifetime, its components must be dismantled and disposed of  respecting the operational regulations 
present in its country of installation. 
The materials that the unit is constructed of are: 
 

-

 

Precoated galvanized steel sheet metal 

-

 

Galvanized steel sheet metal 

-

 

Aluminum 

-

 

Copper 

-

 

Polyester 

-

 

Polyethylene 

-

 

Glass wool 

-

 

Plastic 

 
During disconnection of the unit, avoid gas leakage or liquid spillage on environment, especially if the water has additives 
like glycol. For dismissing and disposal, deliver the units to specialized centers according to your national laws. 

Содержание RKB Series

Страница 1: ..._ RKB_20140130 MIUM ENG docx 1 I IN NS ST TA AL LL LA AT TI IO ON N O OP PE ER RA AT TI IO ON N A AN ND D M MA AI IN NT TE EN NA AN NC CE E M MA AN NU UA AL L 50 EFFICIENCY AIR TO AIR HEAT RECOVERY UN...

Страница 2: ...tive 2004 108 CE and Ecodesign Directive 2009 125 CE The unit belonging to the above series is designed according to the following main safety prescriptions principals of safety integration used mater...

Страница 3: ...SHOCK ATTENTION AUTHORIZED PERSONNEL ONLY 1 INTRODUCTION pag 4 2 DIMENSIONS AND WEIGHTS pag 5 3 INSTALLATION CONFIGURATIONS pag 6 4 TRANSPORTATION pag 7 5 INSTALLATION CONNECTION pag 8 6 WIRING DIAGR...

Страница 4: ...ordance with the laws in force in the country in which the unit is installed Unauthorized tampering with the electrical and mechanical equipment will VOID THE WARRANTY Check the electrical specificati...

Страница 5: ...of the horizontal series RKB M Supply E Exhaust R Return A Fresh air RKB 500 1000 2000 3000 4000 A mm 750 900 1000 1300 1400 B mm 750 900 1000 1300 1400 C mm 290 410 470 530 705 D mm 200 315 355 450 5...

Страница 6: ...ve the following combinations each of them is a specific unit orientation to be specified when ordering Horizontal configuration RKB Configurations shown on the figure below are possible A fresh air R...

Страница 7: ...h inlet outlet panels for example from E to E90 you may need to exchange two panels between each other Vertical configuration RKB vertical kit Configurations shown on the figure below are possible A f...

Страница 8: ...the unit electric and hydraulic connections and any air pipes ducts or free passages Neglecting these aspects may decrease performance and operational life of the unit and therefore increase the opera...

Страница 9: ...ers of such products Before placing in function the unit check the perfect connection of the various components and the internal parts of the system Avoid at all costs human contact with moving parts...

Страница 10: ...of free space as indicated in the following figure This permits ease of installation and maintenance Machine positioning The unit is equipped with anti vibration support plates Referring to the follow...

Страница 11: ...ot interfere with discharge of the unit Water coil connection SAF The water heating or cooling coil SAF is supplied with GAS male threaded headers The tightening must be carried out with extreme care...

Страница 12: ...ed and authorized personnel according to EU Regulation 303 2008 of 2 April 2008 and later that requires companies and technicians that perform maintenance repair leakage checking and recovery recyclin...

Страница 13: ...ed 8 TROUBLESHOOTING Failure searching and problem solving schedule Founded failure Probable cause Possible solution Fans are not running Power supply is switched off Wrong or loose electrical connect...

Отзывы: