![GAYLORD RSPC-ESP-OW Series Скачать руководство пользователя страница 111](http://html.mh-extra.com/html/gaylord/rspc-esp-ow-series/rspc-esp-ow-series_technical-manual_570442111.webp)
____________________________________________________________Appendix B – Assembly, Page B-1
Assembly
Overview
Typically, ClearAir units are shipped as one piece and no unit assemble is required. Sometimes, for
building accessibility reasons, the unit is shipped
in multiple pieces. If this is the case, use the following
instructions to assemble.
1.
Attach ESP Smoke Control Section 1 to Odor Control Section 2
Bolt Section 1 and Section 2 bases together on the outer sides using the provided 3/4” holes. Tech screw
the walls and roofs together using the provided 3/16" holes. From inside the unit, continuously weld the
floor, wall, and roof seams water tight. From outside the unit stitch weld and fire seal along the seams.
2.
Attach Odor Control Section 2 to Plenum Section 3
Bolt Section 2 and Section 3 bases together, on the outer sides using the provided 3/4" holes. From inside
the plenum, tech screw the walls and roofs together using the provided 3/16" holes. Continuously weld the
round fan inlet openings together. From outside the unit stitch weld and fire seal along the seams.
Figure B-1-1
Exploded View
Section 1
Section 2
Section 3
Содержание RSPC-ESP-OW Series
Страница 3: ...Page iii ...
Страница 4: ...Page iv This Page Intentionally Left Blank ...
Страница 8: ...Page viii This Page Intentionally Left Blank ...
Страница 78: ...Chapter 4 Smoke Control Section Page 4 52_________________________________________________ RSPC ESP Drain ...
Страница 124: ...Form Number TM RSPC ESP OW Rev 09 082016 20927 Copyright 2016 Gaylord Industries Litho in U S A ...