13
13
GAUI
TAI SHIH HOBBY CORPORATION
GAUI
TAI SHIH HOBBY CORPORATION
Make sure both sides of the belt are
parallel in the tail boom,
turn the front end of the belt 90
degrees counter - clockwise
(front view).
安裝尾管總承時請確認皮帶方向無誤
不可纏繞。
a.M3x3
b.M2x2
c.M2x5
c.M2x5
Apply thread lock on all
screws in this section.
螺絲均需上止滑劑
1.After assembled the boom, install the main gear set, insert the Mast and tighten the lower collar and
main gear collar, pull up the Mast and Main gear assembly, then install and tighten the
upper mast collar, set the belt tension properly and tighten the M2x3.2 screws of main frame.
2.Belt tension:
The motor should be driven if we rotate the tail blades by hand.
Tighten the(M2x5) screw of boom holder(M2x5).
3.The gear mesh should be set properly and not too tight.(approximatly 0.1mm)
1.將尾管總成裝入機身,安裝主齒盤及皮帶齒盤,再將主軸插入定位,將小襯套套入主軸並鎖緊
再將主軸上推鎖緊皮帶齒盤最後在鎖緊上輪檔。
2.調整皮帶緊度:裝入後將皮帶總成往後適度拉緊(若用手轉動尾旋翼,馬達應可被皮帶帶動旋轉),
將機身後方的M2x5螺絲旋緊固定尾管。
3.注意馬達齒與主齒盤間隙約0.1mm不宜過緊。
適當僅度可提高效能,減少動力耗損。
b.M2x2
a.M3x3
a.M3x3
a.M3x3
(1-1)
皮帶方向確認
機身主軸組裝
Belt Direction Check
Main Gear Installation
Содержание Hurricane 255
Страница 21: ...19 GAUI TAI SHIH HOBBY CORPORATION Note...
Страница 22: ...20 GAUI TAI SHIH HOBBY CORPORATION Note...
Страница 23: ......
Страница 24: ...GAUI http www gaui com tw E mail gaui gaui com tw F A X 886 2 2610 5567...