14
GAUI
TAI SHIH HOBBY CORPORATION
GAUI
TAI SHIH HOBBY CORPORATION
224 mm
a.Ø1.4x4
b.M1.4x6
c.M2x3.2
Apply thread lock on all
screws in this section.
螺絲均需上止滑劑
1. Install tail servo and tail boom
support rods. Adjust tail servo
rod length.
2. Adjust position of servo base
(figure 1-1).
3. Adjust position of servo base
by turning around the tail boom
so that the ball screw on the
servo horn is aligned (figure -2),
clip on the servo rod ball link.
Check parts are leveled horizontally.
All use the
16mm thread rod
30.8mm
31mm
31mm
1.組裝尾舵伺服機及支撐桿,
調整尾舵拉桿長度。
2.調整伺服器座位置(圖1-1)。
3.旋轉伺服機座使球頭呈同一直線
(圖1-2),扣上拉桿。
確認各部位水平。
1
皆使用16mm之全牙螺桿
2
3
A
A
B
C
B
C
3
4
5
5
ESC
GYRO
Receiver
a.Ø1.4x4
5mm
c.M2x3.2
b.M1.4x6
(1-2)
(1-1)
191.5 mm
尾伺服機組裝
機構檢查-1
Tail Servo Assembly
Check - 1
Содержание Hurricane 255
Страница 21: ...19 GAUI TAI SHIH HOBBY CORPORATION Note...
Страница 22: ...20 GAUI TAI SHIH HOBBY CORPORATION Note...
Страница 23: ......
Страница 24: ...GAUI http www gaui com tw E mail gaui gaui com tw F A X 886 2 2610 5567...