4.4.1
WIRING DIAGRAM
17
4.4
ELECTRICAL CONNECTIONS
For the operation of the boiler, a grounded electrical supply 230 VAC 50Hz is required (tolarance must be
between -15% ve +10% ).
Electric supply of the boiler must be cut off via a fuse during the maintenance.
Electrical operations must be made by authorized technical personal in in accordance with regulations and
standards.
Electrical cables should not be passed close to hot surfaces (such as hot water pipes).
L (phase), N(neutral) and grounding connections must be made properly.
All cables must be fitted with a ferrule.
The manufacturer cannot be held liable for damages
caused by negligence or incorrect operation in the
earthing of the boiler.
Содержание Wallcon X-treme 67
Страница 19: ...18...
Страница 20: ...19...
Страница 21: ...20...
Страница 22: ...21 OCI 351 Modbus Module...
Страница 31: ...6 5 MAIN FUNCTIONS 30...
Страница 41: ...16 TROUBLESHOOTING 40 16 TROUBLE SHOOT NG...
Страница 42: ...41...