4.1.4
WATER QUALITY AND TREATMENTS
Paying attention to the following issues related to water
quality will greatly reduce the problems that may arise during
the life time of the boiler and ensure the continuity of the
working efficiency:
Piping and installation companents must be cleaned
before installation.
In old installations, iron oxide, sludge, sediment and
similar deposits should be cleaned.
The water in the system should be analyzed in terms of
hardness, pH, iron content and conductivity.
If all or a part of the heating installation is to be
operated by UNDERFLOOR HEATING SYSTEM,
PLATE HEAT EXCHANGER should be used and the
system should be separated from each other as
primary and secondary.
Faults that may arise if the water conditions are not
in accordance with the values specified in the table,
boiler will be considered out of warranty.
Wall Mount:
The dimensions of the hanger spaces behind the boiler are
shown below.
Drill the holes you marked with a 12 point drill.
Screw the hooks and hanger hooks into place.
Hang the boiler from the sling slots on the wall.
Askı Yuvası
Askı Kancası Dübel
1
2
375
375
Hanger Hooks
Hange
r
Total Hardness
°d
pH
Iron
(Not Diluted)
Conductivity
STAINLESS EXCHANGER
1,00
7,5-9,5
<10ppm
≤
2000µS/cm
ALUMINUM EXCHANGER
1,00
6,5-8,5
<10ppm
≤
2000µS/cm
Gassero Water Specification
11
Содержание Wallcon X-treme 67
Страница 19: ...18...
Страница 20: ...19...
Страница 21: ...20...
Страница 22: ...21 OCI 351 Modbus Module...
Страница 31: ...6 5 MAIN FUNCTIONS 30...
Страница 41: ...16 TROUBLESHOOTING 40 16 TROUBLE SHOOT NG...
Страница 42: ...41...