USE AND MAINTENANCE
58
-
cod. G19503220
ENGLISH
5.0 DEMOLITION AND DISPOSAL
This operation is to be carried out by the customer.
Before demolishing the machine, you are advised to carefully check its physical condition and ascertain whether there are any parts of
the structure that may be susceptible to structural collapse or breakage during demolition.
The customer should operate in compliance with the environment protection laws in force in his/her country.
CAUTION
The machine demolition operations should be carried out by skilled personnel only, equipped with suitable protective clothing
(safety footwear and gloves) and auxiliary tools and equipment.
All the disassembly operations for demolition should be carried out with the machine stopped and detached from the tractor.
Before demolishing the machine, you are advised to render harmless all the parts that may be a source of danger and therefore:
· scrap the structure using specialized fi rms,
· remove any electrical apparatus according to the laws in force,
· collect oils and greases separately, to be disposed of through specialized fi rms, in accordance with the regulations of the country in
which the machine was used.
When the machine is demolished the
CE
mark should be destroyed together with this manual.
Last but not least, we remind you that the manufacturer is always available for any and all necessary assistance and spares.
Содержание S MARIA 250
Страница 31: ...31 Notes cod G19503220 ...
Страница 59: ...59 Notes cod G19503220 ...
Страница 87: ...87 Notes cod G19503220 ...
Страница 115: ...115 Notes cod G19503220 ...
Страница 143: ...143 Notes cod G19503220 ...