ESSENTIAL INFORMATION
The warranty to the product will be voided if any
component of the patio heater is tampered with, or
altered.
To have these units altered or serviced by an
unauthorised person may render the product inefficient,
and at worst dangerous.
SERVICING INSTRUCTIONS
Appliances should be serviced at least annually and
servicing must only be carried out by a Licensed
Plumber or Authorised Person.
1. Remove Guard from Burner Housing.
2. Clean the Burner Ports and top with a Soft Brush.
Inspect and clean all combustion air inlets.
3. Clean thermocouple tip and spark igniter using a
soft wire brush.
4. Check operation of the igniter and the
thermocouple. Should new parts be required
contact the Supplier or Sitro Group Australia.
INSTALLATION FOR WALL MOUNTED
Natural Gas Heaters must be installed by an Authorised
Person.
Brackets for suspended installation must be permanently
fixed to a solid structure.
Positioning of both floor mounted and suspended
heaters must maintain required clearances.
i.e. 1000mm above, 1000mm on all sides and 500mm
below the heater emitter mesh.
It is a Standards Australia requirement that an approved
metal tube such as copper or galvanized steel or an
AGA certified stainless steel braided hose assembly be
utilised to convey gas to the burner head, and must be
installed by an authorised person, i.e. licensed plumber.
A Natural Gas Patio Heater is not designed for relocation
to varying locations, so the most preferable permanent
location should be selected prior to installation.
TO BE INSTALLED ONLY BY AN AUTHORISED PERSON
HEATER ASSEMBLY
NOTE: Recommended clearances must be
maintained.
* Remove transit protection material.
TOOLS REQUIRED:
Drill
Masonry drill bit
Adjustable
spanner
Phillips head screwdriver
STEP 1.
Firmly attach the mounting bracket using expanding
fasteners to a solid wall or alternatively speak with your
hardware supplier.
STEP 2.
Attach the natural gas regulator between the manual
shut off valve of the supply line and the heater gas hose
or pipe and set the outlet pressure at 1kPa.
GAS PIPING
1. Where it is not practical to install solid tube an
AGA certified stainless steel braided hose can be
installed. This hose assembly must comply with AS/
NZS 5601. Gas Installations, pipe sizing tables and
shall not exceed 3 metres in length. The internal
diameter of the hose must not be less than 15mm.
2. Check with local and state plumbing and heating
codes regarding sizing of the gas lines.
3. All gas pipe connections to the heater(s) must
be sealed with a gas pipe compound resistant to
Natural Gas.
4. Installation of a drip leg if required in the gas supply
line going to each heater must conform to AS/NZS
5601.
5. When checking for gas leaks, do no use an open
flame. Use a soap and water solution and check for
bubbles indicating gas leakage (refer Page 6).
6. Installation of 1/8” NPT plugged tapping, accessible
for test gauge connections, is required upstream of
the gas supply connection to the heater.
INSTALLATION AND SERVICING
5
Содержание SOLARIS Series
Страница 19: ...19 NOTES...