MDE-4813D CFN PLUS Installation Manual · February 2018
57
3-9.3. Current Loop Electronic Pump
The wiring for the Current Loop electronic pump is provided as follows:
•
shows the specific wiring connections between CFN PLUS and the Current
Loop pump nozzle, and the terminals that differ from the Mechanical Pump. The figure
shows the serial connection between two Current Loop pumps and the Terminal Block.
•
shows the wiring list for connection to the Terminal, as published in the Wiring
Label added to the inner door. The Wiring Label follows the physical location of the wires
in the Terminal Block, as shown in
Figure 3-20 Current Loop Electronic Pump - Wiring Diagram
Содержание ORPAK CFN PLUS
Страница 33: ...MDE 4813D CFN PLUS Installation Manual February 2018 23 Figure 2 3 Conduits Layout for Mechanical Pump...
Страница 34: ...MDE 4813D CFN PLUS Installation Manual February 2018 24 Figure 2 4 Conduits Layout for Electronic Pump...
Страница 65: ...MDE 4813D CFN PLUS Installation Manual February 2018 55 Figure 3 18 CFN PLUS Terminal Block Wiring List Label...
Страница 80: ...MDE 4813D CFN PLUS Installation Manual February 2018 70 This page is intentionally left blank...
Страница 88: ...MDE 4813D CFN PLUS Installation Manual February 2018 78 Figure B 1 CFN PLUS Wiring Diagram Mechanical Pump...
Страница 89: ...MDE 4813D CFN PLUS Installation Manual February 2018 79 Figure B 2 CFN PLUS Wiring Diagram Electronic Pump...
Страница 90: ...MDE 4813D CFN PLUS Installation Manual February 2018 80 This page is intentionally left blank...