17 SERVICE WORK ON THE ENGINE
112
E02040-10
–
Mount throttle valve body
3
.
–
Remove the locking piece and position the subframe.
Info
Pay attention to intake flange
4
.
–
Position and tighten clamps
3
of the throttle valve body.
Guideline
Screw, intake
flange/reed valve
housing
M6
6 Nm (4.4 lbf ft)
E02039-10
–
Mount and tighten screws
1
.
Guideline
Screw, subframe
bottom
M8x18
30 Nm (22.1 lbf ft)
Loctite
®
2701™
–
Remove screws
2
.
–
Mount and tighten screws
2
.
Guideline
Screw, subframe
top
M8x20
35 Nm (25.8 lbf ft)
Loctite
®
2701™
Finishing work
–
Remove the motorcycle from the lift stand. (
–
Install the air filter box cover. (
–
Install the fuel tank.
–
Add 2-stroke oil. (
–
Prime the oil pump.
–
Mount the seat. (
–
Install the main silencer. (
17.5
Checking the gear oil level
Info
The gear oil level must be checked when the engine is cold.
Preparatory work
–
Stand the motorcycle upright on a horizontal surface.