190-01639-00
GSU 75 ADAHRS Installation Manual
Rev. 6
Page v
PARAGRAPH
PAGE
Section 5 POST INSTALLATION, CONFIGURATION, AND CHECKOUT
PROCEDURE
5.1 Function Selector Switches and Display ......................................................................... 5-1
5.2 Post-Installation Calibration Procedures ......................................................................... 5-1
5.3 Calibration Procedure A-1: Pitch/Roll Offset Compensation by Aircraft Leveling........ 5-3
5.4 Calibration Procedure A-2: Zero Pitch/Roll Offsets by Manual Entry ........................... 5-4
5.5 Calibration Procedure B: Magnetometer Calibration ...................................................... 5-5
5.6 Calibration Procedure C: Heading Offset Compensation................................................ 5-7
5.7 Calibration Procedure D: Engine Run-Up Vibration Test............................................... 5-8
5.8 Calibration Procedure E: Magnetometer Interference Test ........................................... 5-10
5.9 Site Evaluation of Magnetic Disturbances for Magnetometer Calibration Procedure .. 5-14
Appendix A ASSEMBLY AND INSTALLATION DRAWINGS .................A-1
Appendix B INTERCONNECT DRAWING..................................................B-1
340095
The document reference is online, please check the correspondence between the online documentation and the printed version.