20
To install the induction unit:
1. Create a proper flange and opening on the counter-top.
See
“Counter-Top Cut-Out Dimensions” on page 19
2. Install studs on the underside of the counter-top for
mounting the coil carrier and the shield plate. See
“Dimensions: coil carrier and mounting coil carrier” on
3. Install silicone gasket:
(i) Put a line of silicone around the ring.
(ii) Place the silicone gasket (provided).
(iii) Put another line of silicone adhesive on the silicone
gasket.
4. Place the Ceran wok bowl on top of the silicone layers.
5. For a water-tight seal, fill the gap between the bowl
and the inner flange with silicone.
6. Fill the gap between the bowl, the coil carrier, and the
counter-top with silicone sealant.
7. Secure the coil carrier with fasteners shown in section
“Dimensions: coil carrier and mounting coil carrier” on
.
After the Ceran glass is mounted in place, the
coil carrier sheet has to be mounted in a way
that the sensor(s) has to exert a direct pressure
onto the glass. Proper pressure ensures a steady
temperature check. Otherwise the unit would not
function properly or the electronic components
would be damaged.
Each pressure spring has to be compressed to 8mm
to achieve the correct pressure onto the Ceran wok
bowl.
8. Install the shield plate and wait for 24 hours, or per
manufacturer’s recommendation, for the silicone to
cure.
1
3
4
7
5
6
8
2
7
PACTAN
1
PACTAN
3
(ii)
(iii)
(i)
3
3
PA
CT
AN
6
PACTAN
5
4.79"
(121.6 mm)
4.79"
(121.6 mm)
2
4
8mm
Содержание MO/WO 3500
Страница 2: ......
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 10: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 26: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 34: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 39: ......