ISTALLATIO CLEARACE
DAGER
Risk of fire/shock/equipment failure. All minimum
clearances must be maintained. Do not obstruct vents
or openings.
Installation Clearance – Components
b
a
a
b
b
b
b
b
b
b
b
a
Cable Bend /
Connection
Clearance
(minimum)
b
Air Vents
Clearance
(minimum)
Induction
Generator
102mm / 4”
40mm / 1.57”
Coil Carrier
and Shield
Plate
-
40mm / 1.57”
Control Unit
115mm / 4.5“
-
Содержание MO/WO 3500
Страница 2: ......
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 10: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 26: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 34: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 39: ......