Air/oil under pressure will cause severe personal injury or death. Shut down
compressor, relieve system of all pressure, disconnect, lockout and tagout
power supply to the starter before removing valves, caps, plugs, fittings, bolts
and filters.
High temperature operation can cause damage to equipment or personal injury.
Do not repeatedly restart the unit after high temperature stops operation. Find
and correct the malfunction before resuming operation.
All materials used in Gardner Denver
®
compressor units are compatible with
AEON 9000SP Lubricating Coolant. Use caution when selecting downstream
components such as air line lubricating bowls, gaskets and valve trim.
AEON 9000SP Synthetic Lubricant is not compatible with low nitrile Buna N or
acrylic paints. AEON 9000SP is compatible with most air system downstream
components.
1.
Be sure the unit is completely off and that no air pressure is in the air/oil reservoir.
2. Disconnect, tag and lock out the power supply to the starter.
3. Thoroughly drain system:
•
Drain oil from airend and cooler while hot.
•
Break low point connections and drain oil from pipe runs.
•
Dump Oil from filter and reinstall used filter.
4. Fill system with a 50 percent charge of the new lubricant:
•
Start the machine and stay there to observe.
•
Allow the machine to run about five minutes at temperature, or until temperature stabilizes, then
shut down
5.
Thoroughly drain machine.
6.
Change to a new filter and separator.
7.
Fill system with a full charge of the new lubricant.
8.
Machine should then be run normally; however, total run time after the initial changeouts should be
50 percent of normal anticipated service life of the new lubricant.
•
Drain all lubricant from system, change filter and separator, and replace with full charge of the
new lubricant.
9. Subsequent lubricant changeouts should be at normal intervals. (See “Oil Change Interval” and chart,
page 53.
Material Safety Data Sheets (MSDS) are available for all AEON lubricants from your authorized Gardner
Denver distributor or by calling (901) 542-6100.
Содержание INTEGRA AIRSMART EFC99J
Страница 11: ...13 20 600 Page 10 Figure 1 2 COMPRESSOR ILLUSTRATION 302EFC797 B Ref Drawing...
Страница 31: ...13 20 600 Page 30 307EBE546 D Ref Drawing Page 2 of 2...
Страница 32: ...13 20 600 Page 31 Figure 4 4 WIRING DIAGRAM WYE DELTA 20 25 30 HP 230 VOLT 315EBE546 A Ref Drawing Page 1 of 2...
Страница 33: ...13 20 600 Page 32 315EBE546 A Ref Drawing Page 2 of 2...
Страница 35: ...13 20 600 Page 34 308EBE546 D Ref Drawing Page 2 of 2...
Страница 37: ...13 20 600 Page 36 313EBE546 C Ref Drawing Page 2 of 2...
Страница 38: ...13 20 600 Page 37 Figure 4 7 WIRING DIAGRAM FULL VOLT 20 HP 230 VOLT 314EBE546 A Ref Drawing Page 1 of 2...
Страница 39: ...13 20 600 Page 38 314EBE546 A Ref Drawing Page 2 of 2...
Страница 40: ...13 20 600 Page 39 Figure 4 8 WIRING DIAGRAM FULL VOLTAGE 25 30 HP 230 VOLT 317EBE546 A Ref Drawing Page 1 of 2...
Страница 41: ...13 20 600 Page 40 317EBE546 A Ref Drawing Page 2 of 2...
Страница 42: ...13 20 600 Page 41 Figure 4 9 WIRING DIAGRAM LESS STARTER 200 460 VOLT 309EBE546 D Ref Drawing Page 1 of 2...
Страница 43: ...13 20 600 Page 42 309EBE546 D Ref Drawing Page 2 of 2...
Страница 44: ...13 20 600 Page 43 Figure 4 10 WIRING DIAGRAM LESS STARTER 230 VOLT 316EBE546 A Ref Drawing Page 1 of 2...
Страница 45: ...13 20 600 Page 44 316EBE546 A Ref Drawing Page 2 of 2...
Страница 46: ...13 20 600 Page 45 Figure 4 11 WIRING DIAGRAM WYE DELTA 575 VOLT 310EBE546 C Ref Drawing Page 1 of 2...
Страница 47: ...13 20 600 Page 46 310EBE546 C Ref Drawing Page 2 of 2...
Страница 48: ...13 20 600 Page 47 Figure 4 12 WIRING DIAGRAM FULL VOLTAGE 575 VOLT 311EBE546 C Ref Drawing Page 1 of 2...
Страница 49: ...13 20 600 Page 48 311EBE546 C Ref Drawing Page 2 of 2...
Страница 50: ...13 20 600 Page 49 Figure 4 13 WIRING DIAGRAM LESS STARTER 575 VOLT 312EBE546 C Ref Drawing Page 1 of 2...
Страница 51: ...13 20 600 Page 50 312EBE546 C Ref Drawing Page 2 of 2...
Страница 74: ......