300FWF996 Page 17
FIGURE 3-1 Lubricant Recommendations
PLUNGER / PACKING LUBRICATION
The fluid end plungers are lubricated from a
separate lubrication pump through the
stuffing box. The lubrication pump, hosing,
and check valve to the stuffing box is not
provided with the unit.
See
"Plunger
Packing
Lubrication
Recommendation Chart," page 20, for a list
of lubricants recommended for plunger
/packing lubrication.
STARTUP AND NEW PUMP RUN-IN
PROCEDURES
A centrifugal charge pump will be required
to charge the fluid end suction manifold. The
charge pump should be sized according to
the volume to be pumped by the quintuplex
pump so that there is no less than 50 psi
charge when the quintuplex pump operates
at its maximum flow.
The first startup and several hours of the
pump run-in are performed at the factory
during the acceptance tests as a part of
quality assurance procedure. However, the
new pump break-in period process may
continue for the first 80-100 hours of
operation, and therefore it will be each
user s responsibility to perform all the tasks
related to this critical period. As all moving
parts of the pump go through wearing-in
process, steel and bronze wear particles are
carried by the oil flow in the lubrication
system. The resulting contamination of the
lubrication system with the wear particles
and especially clogging of the strainer and
the oil filter may cause serious problems. To
assist the user the following guidelines are
presented for the maintenance personnel to
follow during the critical startup and break-in
period:
1.
Fill
the
lube
oil
reservoir
with
recommended grade of oil. See "Power
End Lubrication," and FIGURE 3-1,
page 17.
HALLIBURTON EXHIBIT 1013, Page 23