Fluid end component inspections should
be performed more frequently than every
six  months  if  pressures  above  2500  psi
are  used  in  the  discharge  system  or  if
corrosive,  abrasive,  flammable  or  hot
(over 110º F) fluids are being pumped.

Proper  stuffing  box  packing  selection  is
important for safe pump operation.   Contact
a Gardner Denver service representative for
assistance  in  selecting  the  proper  packing
before beginning operation.

Before  starting  the  pump  the  first  time,  and
periodically  thereafter  check  the  pump,
suction  and  discharge  system  fastener
torque  versus  the  values  listed  on  page  35
to  insure  proper  tightness.   Over  and  under
torquing  can  damage  threaded  pipes,
connections  and  fasteners,  which  may  lead
to  component  damage  and/or  failure.
Replace  all  components  found  to  be
damaged or defective.   On pumps equipped
with  stuffing  boxes,  the  gland  must  be
engaged by at least three (3) threads to hold
the discharge pressure of the pump.

DANGER

Do  not  attempt  to  service,  repair  or
adjust  the  plunger  packing  or  other-
wise work on the pump while the unit
is  operating.  Shut  off  the  pump  drive
engine  and  relieve  the  fluid  pressure
in the suction and discharge systems
before  any  work  or  investigation  is
performed  on  the  pump  or  pump
systems.

Block the crankshaft from turning and make
certain  that  all  pump  drive  motor  or  engine
start  switches  or  starter  controls  are  clearly
tagged  with  warnings  not  to  start  the  pump
while repair work is in process.

Whenever the pump is operating, continually
monitor  the  entire  suction,  discharge  and
pump 

lubricating 

systems 

for 

leaks.

Thoroughly  investigate  the  cause  for
leakage  and  do  not  operate  the  pump  until

the  cause  of  the  leak  has  been  corrected.
Replace  any  parts  which  are  found  to  be
damaged  or  defective.   When  a  gasketed
joint is disassembled for any reason, discard
the  used  gasket  and  replace  it  with  a  new,
genuine  Gardner  Denver  gasket  before
reassembling the joint.

Due  to  the  high  working  pressures
contained  by  the  fluid  end,  discharge
manifold  and  discharge  piping,  welding  on
these  components  is  not  recommended.   If
welding  on  the  discharge  system  cannot be
avoided, only experienced, qualified welders
should be used.  In addition, the welded part
should be hydrostatically proof tested in the
shop with water or hydraulic fluid to one and
one  half  times  maximum  discharge  system
working  pressure,  with  no  observable  fluid
leakage, before the part is reinstalled  in  the
pump system.

In summary, high pressure fluid streams can
possess sufficient energy to cause personal
injury,  death  and/or  equipment  damage.
These  results  can  occur  either  through
direct  contact  with  the  fluid  stream  or  by
contact  with  loose  objects  the  fluid  stream
has  propelled,  if  the  pump  system  is
improperly 

used, 

or 

if 

the 

fluid 

is

misdirected,  or  allowed  to  escape  from
defective 

or 

improperly 

maintained

equipment.

FLAMMABLE, HOT, COLD OR
CORROSIVE FLUID PUMPING

DANGER

Extreme  caution  must  be  exercised
by trained and experienced operators
when 

flammable, 

hot, 

cold 

or

corrosive fluids are being pumped  to
avoid  personal  injury,  death  an/or
equipment  damage  due  to  explosion,
fire, extreme cold or chemical attack.

Never  operate  a  pump  that  is  pumping
hydrocarbons or  other  flammable, hot, cold,
or  corrosive  fluids  when  any  part  of  the
pump,  suction  system  or  discharge  system

HALLIBURTON EXHIBIT 1013, Page 11

Содержание GD-2500Q QUINTUPLEX

Страница 1: ...ECN 1026734 GARDNER DENVER 300FWF996 Rev C August 2005 WELL SERVICING PUMP MODEL GD 2500Q QUINTUPLEX OPERATING AND SERVICE MANUAL HALLIBURTON EXHIBIT 1013 Page 1...

Страница 2: ...d in pump maintenance and repair They are ready to respond and assist you by providing fast expert maintenance and repair services For the location of your local authorized Gardner Denver distributor...

Страница 3: ...nimal downtime DANGER Danger is used to indicate the presence of a hazard which will cause severe personal injury death or substantial property damage if the warning is ignored WARNING Warning is used...

Страница 4: ...pair Parts i Foreword ii Index iv List of Illustrations v Section 1 Danger Notices 1 Section 2 Design Description and Specifications 9 Section 3 Preparation Operation and Maintenance 15 Section 4 Serv...

Страница 5: ...ntenance Schedule 19 Oil Stop Head Seal Retainer and Gear Covers 24 Ordering Instructions Repair Parts I Performance Rating 14 Periodic Routine Maintenance Schedule 18 Plunger Packing Lubrication 17 P...

Страница 6: ...2500Q Power End Rear Section View 11 Figure 2 4 GD 2500Q Gear Reduction Components 12 Figure 2 5 GD 2500Q Fluid End 13 Figure 3 1 Lubricant Recommendations 17 Figure 4 1 GD 2500Q Fluid End Tightening...

Страница 7: ...Operators should not begin or continue operations when tired distracted or under the influence of alcohol or any type of prescription or nonprescription drugs The timely replacement of expendable par...

Страница 8: ...goggles Check to insure they have safe footing Fully engage the wedge to prevent it from disengaging violently from the cover as a blow is struck Wipe their hands and the hammer handle and maintain a...

Страница 9: ...port skid Packages too large to lift as fully assembled should be separated into smaller loads For these smaller loads the lifting devices should be fastened to the lifting attachments normally built...

Страница 10: ...ischarge line valves are open Check all fluid end discharge system components including pipes elbows connections threads fasteners hoses etc at least once every six months to confirm their structural...

Страница 11: ...systems for leaks Thoroughly investigate the cause for leakage and do not operate the pump until the cause of the leak has been corrected Replace any parts which are found to be damaged or defective W...

Страница 12: ...umping units where flammable or explosive vapors could form should be equipped with an air inlet shut off If flammable or explosive vapors are present in the pumping site atmosphere an engine could co...

Страница 13: ...jury death and or damage to equipment Make sure the work area is checked for hazardous fumes has adequate ventilation for engine exhaust and sufficient drainage for released fluid Check the work area...

Страница 14: ...to the safe operation of high pressure liquid jetting blasting and cleaning equipment After you have selected and purchased these components follow the manufacturer s instructions completely in their...

Страница 15: ...loped by American Gear Manufacturers Association The issue of personnel safety is the most important topic covered in this manual Therefore in the beginning of this manual the user is introduced to da...

Страница 16: ...and assembly including dimensional and tolerance data running clearances for all bearings and recommended fastener torques PUMP DESIGN The GD 2500Q quintuplex pump uses only two major assemblies power...

Страница 17: ...eads are on the same centerline The fluid end is held in place and in alignment with the power end by the twenty 20 stay rods See FIGURE 2 1 The power end is fully enclosed to contain the power end oi...

Страница 18: ...aring It also connects to the crosshead oil supply giving a redundant oiling pathway This is repeated for the rest of the main bearing and crosshead components Oil is removed from the power end throug...

Страница 19: ...provided in the fluid cylinder The conventional fluid end Valve Over Valve configuration offers field a proven arrange ment in terms of the valve and spring performance Improvements in the fluid end...

Страница 20: ...1 91 191 17800 287 13500 478 8100 631 6100 4 2 17 217 15600 326 11800 544 7100 718 5400 4 5 2 75 275 12400 413 9300 688 5600 908 4200 5 3 40 340 10000 510 7600 850 4500 1121 3400 5 5 4 11 411 8300 61...

Страница 21: ...eventative will not clog the oil passages 5 Remove the breather and either plug or tape the opening 6 Coat the gear reducer input shaft and all exposed bare metal with a heavy rust preventive 7 Plug d...

Страница 22: ...failure to meet these requirements has lead to pump damage because of restricted oil flow in the lube pump inlet Therefore the following guidelines developed as a result of long experience should be a...

Страница 23: ...several hours of the pump run in are performed at the factory during the acceptance tests as a part of quality assurance procedure However the new pump break in period process may continue for the fir...

Страница 24: ...ading and entire system for proper operation 14 If the quintuplex pump is equipped with a transmission run the pump for 30 min in each gear in the higher gear ranges pulling full horsepower in each ge...

Страница 25: ...after extended continuous operation Monthly 100 hour Routine Maintenance Tasks 1 Clean the strainer and replace the oil filter element 2 Check the entire lube system for leaks and eliminate them 3 Che...

Страница 26: ...rill 32 35 F Exxon Arox EP 46 20 F Arox 150 35 F Mobil Oil Co Almo 525 20 F Almo 527 20 F Almo 529 10 F Almo 532 0 F Pacer Oil Rockdrill 150 10 F Rockdrill 600 0 F Phillips Petroleum EP 500 Summer or...

Страница 27: ...pump FLUID END SERVICE This discussion starts with the description of steps necessary for removal and installation of the fluid cylinder assembly and proceeds to the removal and replacement of expenda...

Страница 28: ...ections and auxiliary equipment FIGURE 4 1 GD 2500Q Fluid End Tightening Sequence Plunger and Packing Replacement This service procedure can be performed with the fluid cylinder in place on the pump a...

Страница 29: ...new fluid end size by following steps 1 through 6 on page 22 Valve and Seat Replacement This procedure may be performed with the fluid end on the pump WARNING Never try to remove or cut a valve seat...

Страница 30: ...d end tapered bores POWER END SERVICE DANGER Before attempting to service the power end of the pump the following safety precautions must be observed 1 Shift the pump transmission into the neutral gea...

Страница 31: ...unscrew the four slotted nuts holding the rod cap in place 10 Remove the rod cap CAUTION The rod cap is held in place by two dowel pins DO NOT DAMAGE PINS 11 After removal of the rod cap the rod will...

Страница 32: ...pinion bearing housings Using jackscrew holes remove one housing 6 With one pinion bearing housing removed pull the corresponding pinion bearing from the pinion as the bearing will not pass through th...

Страница 33: ...k 15 If the crankshaft main bearings are to be replaced all bearing retainers must be removed from the crankshaft The crankshaft should be held in a vertical position and the bearings rapidly heated a...

Страница 34: ...he retaining rings in the frame after installing the outer main bearing races Also braze the retaining rings securing the inner and outer bearing races of the outer two main bearings on either end of...

Страница 35: ...line 3 Clean out line 4 Suction and or discharge 4 Remove the obstruction valves propped open Low Discharge Pressure 1 Worn or fluid cut valve 1 Replace valve assembly 2 Valve propped open 2 Remove t...

Страница 36: ...in supply tank Reduce pump speed 10 Air entering suction line 10 Repair suction line 11 Air entering charging pump 11 Tighten or replace shaft packing or seal 12 Air entering or charge gas 12 Repair a...

Страница 37: ...to 11 See Excessive Valve power end Noise problem 12 Cavitation noise transmitted 12 See Cavitation Fluid to or causing shock loading in Knock or Hammer problem power end Excessive Valve Noise 1 Pump...

Страница 38: ...Corrosion due to wrong 4 Determine and install correct stuffing box material stuffing box for pumped fluid 5 Stuffing box bore worn 5 Replace stuffing box Pumped Fluid In 1 Worn damaged or corroded 1...

Страница 39: ...rvice 5 Wrong size packing 5 Install correct size packing 6 Improper packing installation 6 Check installation procedure and install correctly 7 Excessive crosshead wear 7 Replace crosshead 8 Pump cav...

Страница 40: ...em Stud Failures 1 Catastrophic failures 1 See Catastrophic Failures problem 2 Improper nut torque 2 Check torque specifications and torque to correct values 3 Stud bending due to uneven 3 Check nut s...

Страница 41: ...Centers 10 00 Connecting Rod Bearing Bore Assembled in Journal Bearing Housing 7 507 7 510 Crosshead Guide Bore 9 000 9 004 Crosshead 8 981 8 979 Wrist Pin 5 000 5 001 Wrist Pin Bushing Bore 5 009 5...

Страница 42: ...asteners 3 4 10 280 Intermediate Rod to Crosshead 3 4 10 160 Fluid End to Suction Manifold 7 8 9 260 Discharge Flange to Fluid Cylinder Nuts 1 8 475 Bull Gear Retaining Scews Gr 8 1 1 4 7 1050 Stay Ro...

Страница 43: ...ours of operation or three 3 months after start up not to exceed 120 days after delivery to Purchaser whichever occurs first The exceptions are as follows 1 Power end is warranted for twelve 12 months...

Страница 44: ...if any given to Company by such manufacturer but only to the extent the Company is able to enforce such warranty or guaranties The Company has not authorized any party to make any representation or w...

Страница 45: ...WARRANTY REQUESTS Products to be returned for warranty analysis shall be approved for return in writing by the Company prior to shipment All requests for product return shall be submitted by email Fac...

Страница 46: ...r Gardner Denver Inc 4747 South 83rd East Avenue Tulsa OK 74145 PH 918 664 1151 800 637 8099 FAX 918 664 6225 www gardnerdenver com Specifications subject to change without notice Copyright 2001 Gardn...

Отзывы: