1. General Safety Information
- 2 –
2. Receiving, Moving, Unpacking
1. General Safety Information
1.1
Pressurized D
evices:
•
This equipment is a pressure-containing device.
•
Do not exceed maximum operating pressure as shown on
the equipment serial number tag.
•
Verify that equipment is fully de-pressurized before
performing service or maintenance functions.
1.2
Electrical:
•
This equipment requires electricity to operate.
•
Install equipment in compliance with national and local
electrical codes.
•
Standard equipment is supplied with NEMA 4,4X electrical
enclosures and is not intended for installation in hazardous
environments.
•
Disconnect power supply to equipment when performing
any electrical service work.
1.3
Breathing Air:
•
Air treated by this equipment may not be suitable for
breathing without further purification.
•
Refer to OSHA standard 1910.134 for the requirements for
breathing quality air.
1.4
Noise:
CAUTION
: Do not operate dryer without mufflers
installed.
1.5
High Velocity
Air:
CAUTION
: Do not stand near mufflers during tower
depressurization.
2. Receiving, Moving, Unpacking
2.1
Receiving:
•
This shipment has been thoroughly checked, packed and
inspected before leaving our plant.
•
It was received in good condition by the carrier and was so
acknowledged.
•
Check for visible loss or damage. If this shipment shows
evidence of loss or damage at time of delivery to you, insist
that the carrier’s agent make a notation of this loss or
damage on the delivery receipt.
2.2
Moving:
CAUTION
: Use lifting lugs (Models 590-5400) or
forklift. Do not lift equipment by piping.
2.3
Unpacking:
•
Check for concealed loss or damage. When a shipment has
been delivered to you in apparent good order, but
concealed damage is found upon unpacking, notify the
carrier immediately and insist that his agent inspects the
shipment.
•
Fifteen days from receipt of shipment is the maximum time
limit for requesting such inspection.
•
Concealed damage claims are not our responsibility as our
terms are F.O.B. point of shipment.
Содержание DGH Series
Страница 12: ...4 Installation 12 4 Installation Figure 4 3 continued on next page 590 5400 SCFM General Arrangement...
Страница 22: ...6 Controller Level 1 22 6 Controller Level 1 Figure 6 2 Electrical Schematic Level 1 Controller...
Страница 23: ...6 Controller Level 1 23 6 Controller Level 1 Figure 6 3 Point to Point Connection Diagram Level 1 Controller...
Страница 24: ...6 Controller Level 1 24 6 Controller Level 1 Figure 6 4 continued on next page Panel Layouts Level 1 Controller...
Страница 39: ...7 Controller Level 2 39 7 Controller Level 2 Figure 7 2 Electrical Schematic Level 2 Controller...
Страница 42: ...7 Controller Level 2 42 7 Controller Level 2 Figure 7 4 continued on next page Panel Layout Level 2 Controller...