Step 12: Attach Side Burner and Shelf
30
32
33
12
1. Attach the side burner
30
to the left legs. Connecting elements: 4 × Step Screw
GG
.
2. Attach the hooks
33
to the front of the foldable shelf
32
. 3 × Screw M6×12
HH
.
3. Attach the foldable shelf
32
to the right legs. Connecting elements: 4 × Step
Screw
GG
.
4. Make sure all nuts and bolts are fully tightened.
Assembly instruction
22