2
If you choose to vary from these instructions your
warranty will be impaired.
If you need advice, call us
FREE
on
0800 807 433
or email us at [email protected]
!
i
COMPONENTS CHECKLIST
Please check the parts carefully and advise immediately if any are damaged or missing.
A
3 x 1830mm sheets for back
B
6 x 1200mm sheets for roof
C
4 x sloping sheets &
2 x gable cut sheets for ends
D
1 x 780mm wide sheet with
door jamb attached
E
Door pre-hinged to 700mm
sheet with door jamb
F
4 x 2255mm channels with
ends cut for front and
back walls
G
4 x 2255mm channels
for roof
H
2 x 2255mm channels for
bottom & 2 x 2290mm
channels for top of end walls
I
4 x 1200mm ‘L’s for flashing
the roof to the end walls
L
2 x gable plates for
gable ends
N
2 x ‘Z’ door braces
Pan
Rib
2 x 793mm door spacers
J
1 x pack of rivets with padbolt for Zincalume sheds, rivets for colour
sheds, 2 x ‘Z’ door braces and riveter for general assembly
M
1 x 2255 mm ridge beam
K
IMPORTANT!
•
Remove the swarf (drill filings) from the panels as you assemble them.
•
All components are cut to length. Do not cut any parts unless instructed.
•
Rivets through the inside of the channels into the sheeting are just as important
as rivets from the outside.
RIBS AND PANS
•
Generally most rivets are spaced at 300mm apart.
•
Keep the rivets in the pans as close to the ribs as possible for added strength.
•
Ribs will always protrude to the outside of the shed.
•
Extra internal rivets are strongly recommended in high wind areas.
DIAGRAM 1
DIAGRAM 2
DIAGRAM 3
BUILDING YOUR SHED
The basic task is to join the sheets together to form your
panels, and rivet channels to the top and bottom of these
panels. They will then join together to form your shed
(diagram 1, 2 and 3).