DUAL LASER PARKING GUIDE - ASSEMBLY INSTRUCTION
STEP #4 STEP #5
STEP #4: PLUG THE AC ADAPTER INTO THE OUTLET AND LASER UNIT. USE WIRE TIES AND WIRE CLAMPS
TO GIVE THE INSTALLATION A "NEAT" APPEARANCE IF NEEDED OR DESIRED.
IT IS NOT RECOMMENDED TO INSTALL BATTERIES IN THE LASER UNIT AS A "BACKUP" POWER SOURCE. IT
IS A WASTE. THE LASER UNIT WILL RESET AUTOMATICALLY IF POWER IS LOST TEMPORARLY. ALSO DO
NOT USE THE BATTERIES AS A MAIN SOURCE OF POWER. THEY WILL DRAIN OUT OF POWER IN 2-3 DAYS.
STEP #5: ROTATE BOTH LASER BARRELS FORWARD / BACKWARD AND LEFT/RIGHT TO SHINE ON THE
SELECTED AREAS ON BOTH VEHICLES IN STEP #2.
PG 3 QUESTIONS ???? CALL 1-866 664 2724 REV 1, 12/11