Installing the Cell Processing Set
COBE 2991 Cell Processor
•
Essentials Guide
6-5
P
rocessing
and C
o
mmon
Operations
6
17
Lift the seal weight slightly so that the seal weight latch arms clear the sliding
covers’ plastic blocks (Figure 6-4), and open the sliding covers.
When the sliding covers are open, Gambro BCT suggests that you leave the
seal weight in place on the guide posts to prevent it from being inadvertently
dropped and damaged.
Figure 6-4: Lifting the seal weight
Caution:
Seal weight latch arms
Содержание COBE 2991
Страница 1: ......
Страница 18: ...This page intentionally left blank ...
Страница 19: ...This page intentionally left blank ...
Страница 20: ...This page intentionally left blank ...
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ...Hướng dẫn sử dụng Part No 770273 010 Reorder No 709016 000 2005 05 Máy xử lý tế bào ...
Страница 27: ...COBE 2991 Cell Processor Essentials Guide 1 1 Introduction 1 1 Giới thiệu ...
Страница 37: ...Operator Controls 3 COBE 2991 Cell Processor Essentials Guide 3 1 Các kiểm soát của người vận hành ...
Страница 48: ...LED Programming 4 COBE 2991 Cell Processor Essentials Guide 4 1 4 Lên chương trình LED ...
Страница 59: ...Pin Diode Programming 5 COBE 2991 Cell Processor Essentials Guide 5 1 5 Lên chương trình Pin Diode ...
Страница 105: ...Troubleshooting 7 COBE 2991 Cell Processor Essentials Guide 7 1 7 Xử lý sự cố ...
Страница 116: ...General Maintenance 8 COBE 2991 Cell Processor Essentials Guide 8 1 8 Bảo dưỡng ...
Страница 120: ...Essentials Guide 1 6 17 05 10 29 08 AM ...
Страница 121: ...Essentials Guide Part No 770273 010 Reorder No 709016 000 2005 05 Cell Processor ...