<Inject water from the air outlet>
Injection method
Drainage hose
Water drainage outlet for
repair(with rubber plug)
(using this outlet to drain the
water in the drainage groove)
Test hole
More than 100mm
<inject water from test hole>
Plastic spraying pot
(the pipe should be
about 100mm)
Cover of test hole
Inject 600cc water from the air out-
let or test hole, check the status of
water drainage.
After completing electrical circuit
installation, check the status of
water drainage while cooling.
After completing the installation,
check whether water drainage is
fluent.
2.
Electrical wiring
The parts, material and electrical
work supplied must meet local
regulations.
Power must have rated voltage
and specified air conditioner
circuit.
As for the electrical work, please
refer to the circuit diagram at-
tached on the units.
The installation of all electrical cir-
cuits must be carried out by pro-
fessional technicians.
The breaker for the power of the
whole system must be installed.
Make sure that proper grounding
wiring is done.
Install according to the national wir-
ing regulation.