If you choose to vary from these instructions your warranty will be impaired
4
3
STEP 3
FRONT WALL
Lay out the door with the sheet attached and the corner door jamb with the 'U' channel
attached (as shown below). Cap the sheets with the 1515mm channels
F
. Use the door
spacers
F
to make sure the door fits the gap (they sit on top of the 'Z' door jambs
L
).
Drill and fix the channels at every second rib down through the top.
Attach the door spacers at each end through the 'Z' door jambs and channels. Put three
fixings underneath through the channels into the sheeting pan and the top and bottom of
the door spacers and 'Z' door jambs (see diagram 1).
Fit the padbolt to the door strap on the outside of the door using wide flange
fixings or screws.
ADDITIONAL
INFORMATION
Channels will come short
of the ends of the sheeting by
10-15mm on all panels.
PADLOCK KEEPER
ASSEMBLY
KEEPER
WASHER
RIVET
CHANNELS
The higher side of the channel goes to the
inside of the shed. It is very important to
include the fixings on the underside of all
the channels as they are structural (except
roof channels).
SPACER
CHANNEL
Fix through the top and bottom of the channels into the door
jamb and spacer. The door jamb goes on inside of the channel.
OUTSIDE
INSIDE
GALVO TIP
To hinge the door on the opposite
side, simply put the top channel
on the bottom and the bottom on
the top.
Put the padbolt on the door
before erecting the panels. It will
stop the door swinging around!
YOU WILL NEED
2 x 1515mm 'U' channels
2 x 793mm 'U' channels (door spacers)
1 x 1980 mm x 715mm sheet
'Z' door jambs (attached to B)
Padbolt
F
I
B
L
N
L
N
B
F
F
I
I