background image

 

 

© Galvin Engineering Pty Ltd 

 

Product Installation Guidelines 

Document No.: 001.00.10.16 

Version 1, 4 November 2022, Page 

7

 of 

7

 

TROUBLESHOOTING

 

PROBLEM 

CAUSE 

RECTIFICATION 

Water is not flowing or has 
inconsistent flow 

Shower is blocked with debris. 

Remove debris from shower. 

Leak from elbow 

Insufficient sealant 

Ensure thread tape has been used 
during installation. 

Taps are dripping water 

Ceramic discs are worn or damaged 

Remove and inspect SBA. Remove 
debris and/or replace SBA if damaged. 

Tap seat is damaged 

Refurbish tap seat using a reseating 
tool. 

Water is leaking from spindle 

O-ring on jumper valve spindle is 
damaged or worn 

Replace o-ring 

Water is not flowing from tap 

Water is turned off 

Turn on water 

Aerator or flow regulator is blocked 
by debris 

Remove aerator and/or flow regulator 
from tap and remove debris. Install an 
inline strainer. 

Spindle is difficult to turn  

 

Build up of scale on spindle, spindle 
worn or o-ring has been damaged 

Remove cartridge sleeve, clean and 
regrease. Replace o-ring. Complete 
SBA may need to be replaced. 

Handle is loose 

Screw has come loose 

Tighten handle screw 

Flange does not screw down onto 
wall surface 

Wall bodies are set too far out 

Re-position tap bodies  

 

WARRANTY 

 

The warranty set forth herein is given expressly and is the only warranty given by the Galvin 
Engineering Pty Ltd. With respect to the product, Galvin Engineering Pty Ltd makes no other warranties, 
express or implied. Galvin Engineering Pty. Ltd. hereby specifically disclaims all other warranties, 
express or implied, including but not limited to the implied warranties of merchantability and fitness for a 
particular purpose. 
 
Galvin Engineering Pty Ltd products are covered under our manufacturer’s warranty available for 
download from www.galvinengineering.com.au  Galvin Engineering Pty Ltd expressly warrants that the 
product is free from operational defects in workmanship and materials for the warranty period as shown 
on the schedule in the manufacturer’s warranty. During the warranty period, Galvin Engineering will 
replace or repair any defective products manufactured by Galvin Engineering without charge, so long as 
the terms 

of the Manufacturer’s warranty are complied with. 

 
The remedy described in the first paragraph of this warranty shall constitute the sole and exclusive 
remedy for breach of warranty, and Galvin Engineering Pty Ltd shall not be responsible for any 
incidental, special or consequential damages, including without limitation, lost profits or the cost of 
repairing or replacing other property which is damaged if this product does not work properly, other 
costs resulting from labour charges, delays, vandalism, negligence, fouling caused by foreign material, 
damage from adverse water conditions, chemical, electrical or any other circumstances over which 
Galvin Engineering has no control. This warranty shall be invalidated by any abuse, misuse, 
misapplication, improper installation or improper maintenance or alteration of the product. 

 

 

Содержание TCS9J150C

Страница 1: ...event back siphonage 80 150 mm CliniLever contra rotating lever handles make showering easier for users with disabilities or limited hand mobility Handles are finished in bright chrome plate finish for added durability and easy cleaning Suitable for installation and will assist in compliance to AS1428 1 Design for access and mobility General requirements for access New building work IMPORTANT All ...

Страница 2: ... Galvin Engineering Pty Ltd Product Installation Guidelines Document No 001 00 10 16 Version 1 4 November 2022 Page 2 of 7 PRE INSTALLATION MOUNTING DETAILS SHOWER ...

Страница 3: ...ion Guidelines Document No 001 00 10 16 Version 1 4 November 2022 Page 3 of 7 MOUNTING DETAILS WALL TOP ASSEMBLY Wall body Wall body must be G5 8 FI and body should be between 0 and 15mm behind the finished wall surface 80 150 mm Wall Top Assembly ...

Страница 4: ... Other type of screws may rust and void warranty When marking out the grab rails use centre base holes of flange protector When marking out corner grab rails follow the fixing guide lug diagram shown above to suit grab rail orientation 1 Install straight grab rails including the horizontal section of any grab rail if applicable as per AS 1428 1 800 810mm from floor to top of rail Make sure the wal...

Страница 5: ...ead tape or sealant to the wall spud ensure the opening is not obscured Failure to do so may restrict or block the flow restrictor affecting the flow of water Remove spigot by loosening grub screw in elbow Fit spigot to wall spud ensuring the flow regulator is in place and not damaged when tightening the spigot 9 Connect Flange Wall Outlet Elbow Fit elbow over spigot and secure with grub screw Usi...

Страница 6: ...amic cartridge into the valve body by hand tighten using a 17mm spanner Refit threaded sleeve and spindle The turn ceramic head part MUST be fitted into the wall body prior to refitting the threaded sleeve and spindle DO NOT tighten cartridge by using the spindle or the threaded sleeve 2 Fit wall flange Ensure o ring is fitted to the bottom of the wall flange and then hand tighten the wall flange ...

Страница 7: ...makes no other warranties express or implied Galvin Engineering Pty Ltd hereby specifically disclaims all other warranties express or implied including but not limited to the implied warranties of merchantability and fitness for a particular purpose Galvin Engineering Pty Ltd products are covered under our manufacturer s warranty available for download from www galvinengineering com au Galvin Engi...

Отзывы: