![Galvin Engineering Ezy-Push CP-BS Lead Safe Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/galvin-engineering/ezy-push-cp-bs-lead-safe/ezy-push-cp-bs-lead-safe_product-installation_3316232002.webp)
© Galvin Engineering Pty Ltd
Product Installation Guidelines
Version 1.1, 13 May 2021, Page
2
of 4
PRE-INSTALLATION
MOUNTING DETAILS
Note: Before installation, all lines must be
flushed. We recommend that a line strainer be
installed prior to taps to eliminate any foreign
material.
INSTALLATION
IMPORTANT: Galvin Specialised products must be installed in accordance with these installation
instructions and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water
and/or electrical supply conditions must also comply to the applicable national and/or state standards. Failing
to comply with these provisions shall void the product warranty and may affect the performance of the
product.
Fit cartridge assembly
−
Fit the cartridge into the body (supplied separately) as shown.
−
Tighten the cartridge assembly down firmly. Do not over tighten as this could restrict or stop the flow.
If this occurs loosen the cartridge by ¼ of a turn.
−
Connect the water lines & turn on water.
Check for leaks and correct operation.