background image

 

© Galvin Engineering Pty Ltd 

 

Product Installation Guidelines 

Document No.: 001.00.10.00 

Version 1, 23 November 2021, Page 

2

 of 5 

 

PRE-INSTALLATION -

 MOUNTING DETAILS

 

Note:

 

Before installation, all lines must be flushed. We recommend that a line strainer be installed prior to top  

          assembly to eliminate any foreign material.

 

 

 
 

TCBTC80CC/TCBTC80HC/TCBTJ80CC/TCBTJ80HC 

 

 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

TCBTC150CC/TCBTC150HC/TCBTJ150CC/TCBTJ150HC 

 

 
 

INSTALLATION

 

IMPORTANT: Galvin Engineering products must be installed in accordance with these installation instructions and 
in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical supply 
conditions must also comply to the applicable National and/or State standards. Failing to comply with these provisions 
shall void the product warranty and may affect the performance of the product. 

 

 

 

 
 
 
 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 

1.  Disassemble & Fit 

Disassembly the top assembly per part 
and fit the spindle to the basin body

 

The top assembly is designed to screw 
directly into any 15mm body that 
complies with Australian Standard 
AS/NZS 3718. Check that the existing 
valve body complies to AS/NZS 3718.

 

 
 

 
 
 
 
 
 
 
 
 
 
 

2.  Fit basin/sink flange 

 

Tighten the vanity flange onto the threaded basin 
body. 

 

Take care not to overtighten 

 

Spindle 

Basin body 

(Not Supplied) 

Отзывы: