![Galvin Engineering CliniLever TCBTC80CC Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/galvin-engineering/clinilever-tcbtc80cc/clinilever-tcbtc80cc_product-installation_3300655003.webp)
© Galvin Engineering Pty Ltd
Product Installation Guidelines
Document No.: 001.00.10.00
Version 1, 23 November 2021, Page
3
of 5
3. Locate handle
−
Insert the adaptor bush onto the spindle
−
When the spindle is in the closed
position, firmly press the lever handle
onto the spindle with levers facing
forward.
−
Check the handle operation. It should
turn freely for a ¼ turn.
4. Fit handle
-
Secure the handles in position using the supplied
screws and washers.
5. Fit water temprature indicator & testing
−
Once the lever handles are secure, fit the
appropriate water temperature indicators.
−
Hot/warm on the left handle, cold on the
right.
−
Once secured, connect the hot and cold
water.
−
Open the lever handles and ensure that
there is flow from both hot and cold
inlets.
−
Inspect the tap and check for any leaks.
Spindle
Adaptor bush
Lever handle