Galvin Engineering CliniLever TCBTC80CC Скачать руководство пользователя страница 3

 

© Galvin Engineering Pty Ltd 

 

Product Installation Guidelines 

Document No.: 001.00.10.00 

Version 1, 23 November 2021, Page 

3

 of 5 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 

 

3.  Locate handle 

 

Insert the adaptor bush onto the spindle 

 

When  the  spindle  is  in  the  closed 
position,  firmly  press  the  lever  handle 
onto  the  spindle  with  levers  facing 
forward.  

 

Check  the  handle  operation.  It  should 
turn freely for a ¼ turn. 

4.  Fit handle 

Secure the handles in position using the supplied 
screws and washers. 

 

 

5.  Fit water temprature indicator & testing 

 

Once the lever handles are secure, fit the 
appropriate water temperature indicators. 

 

Hot/warm on the left handle, cold on the 
right.

 

 

Once secured, connect the hot and cold 
water. 

 

Open the lever handles and ensure that 
there is flow from both hot and cold 
inlets.  

 

Inspect the tap and check for any leaks. 

 

Spindle 

Adaptor bush 

Lever handle 

Отзывы: